Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
12/04/2020
Applicant:
Thomas Garrett
Description:
3-STORY APRT BLDG ESTMODELB T20-M0022

Permit Reviews

Permit Number - T20CM08500
Permit Status: Complete
Permit Description: 3-STORY APRT BLDG ESTMODELB T20-M0022
Start Date Submittal Complete Date Status  
01/12/2021 RESUBMITTAL 01/21/2021 COMPLETED Review Details
04/05/2021 REVISION - - 1ST 04/16/2021 COMPLETED Review Details
08/03/2021 REVISION - - 2ND 08/11/2021 COMPLETED Review Details
11/30/2020 COMMERCIAL - NEW 01/12/2021 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T20CM08500
Permit Status: Complete
Permit Description: 3-STORY APRT BLDG ESTMODELB T20-M0022
Total Outstanding Activity Conditions - 1
Date Name
12/04/2020 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Conditions

Permit Number - T20CM08500
Permit Status: Complete
Permit Description: 3-STORY APRT BLDG ESTMODELB T20-M0022
Date Description Comments
04/15/2021 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
04/15/2021 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
03/13/2022 SPECIAL INSPECTION FORMS AND REPORTS REQUIRED PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY.
12/04/2020 SPECIAL INSPECTION FOR CONCRETE IS REQUIRED..
03/13/2022 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
03/13/2022 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
12/04/2020 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
09/23/2022 Water Chlorination Report Required
09/30/2022 AIR BALANCE REPORT REQUIRED

Outstanding Inspections

Permit Status: Complete
Permit Number: T20CM08500
Permite Description: 3-STORY APRT BLDG ESTMODELB T20-M0022
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
11/04/2022 COT - LCBU - CofO N/A Canceled Inspection Canceled

Completed Inspections

Permit Status: Complete
Permit Number: T20CM08500
Permit Description: 3-STORY APRT BLDG ESTMODELB T20-M0022
Total Completed Inspections - 30
Date Description Inspector Results Comments
04/15/2021 COT - LCBU - Roof Nailing Passed {Activity date: 04/15/2021; Status: Approved; Inspector: ENEWCOMB; Comment: Entered by ENEWCOM1 - }
06/04/2021 COT - LCPL - Rough Soil Passed {Activity date: 06/04/2021; Status: Approved; Inspector: RCHANDLER; Comment: Entered by VLEON1 - }
06/14/2021 COT - LCPL - Yard Water Line Passed {Activity date: 06/14/2021; Status: Approved; Inspector: RCHANDLER; Comment: Entered by VLEON1 - } ; {Activity date: 05/03/2021; Status: Cancelled; Inspector: RCHANDLER; Comment: Entered by VLEON1 - }
08/26/2021 COT - LCEL - Electrical Underground Passed {Activity date: 08/26/2021; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved} ; {Activity date: 08/04/2021; Status: Cancelled; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Inspection canceled by contractor}
08/26/2021 COT - LCBU - Excavation/Rebar/Zoning Passed {Activity date: 08/26/2021; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved} ; {Activity date: 08/04/2021; Status: Cancelled; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Inspection canceled by contractor}
08/26/2021 COT - LCBU - Preslab Passed {Activity date: 08/26/2021; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved} ; {Activity date: 08/04/2021; Status: Cancelled; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Inspection canceled by contractor}
08/26/2021 COT - LCEL - Grounding/Bonding Passed {Activity date: 08/26/2021; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved} ; {Activity date: 08/04/2021; Status: Cancelled; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Inspection canceled by contractor}
05/04/2022 COT - LCBU - Exterior Clips/Sheathing Passed {Activity date: 05/04/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved} ; {Activity date: 02/07/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Partial approval for 1st floor only

}
05/18/2022 COT - LCBU - Building Above Ceiling Passed {Activity date: 05/18/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved}
05/18/2022 COT - LCEL - Electrical Intermediate Passed {Activity date: 05/18/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved}
05/18/2022 COT - LCBU - Framing Passed {Activity date: 05/18/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved} ; {Activity date: 05/02/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Partial approval for roof nailing

} ; {Activity date: 03/24/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Partial approval for 3rd floor floor nailing

} ; {Activity date: 02/15/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Partial approval for 2 floor nailing

}
05/18/2022 COT - LCBU - Firewall/Fire Barrier/Firestop Passed {Activity date: 05/18/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved}
05/18/2022 COT - LCPL - Plumbing Intermediate Passed {Activity date: 05/18/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved}
05/18/2022 COT - HCBU - Exterior Clips/Sheathing Passed {Activity date: 05/18/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved}
05/18/2022 COT - LCBU - Sustainability Passed {Activity date: 05/18/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved}
05/18/2022 COT - LCEL - Electrical Above Ceiling Passed {Activity date: 05/18/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved}
05/18/2022 COT - LCME - Mechanical Intermediate Passed {Activity date: 05/18/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved}
05/27/2022 PDSD Building Division - TEP PM Clearance Passed {Activity date: 05/27/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - CODE ECO/units
11105, 11106, 11107, 11108, 11205, 11206, 11207, 11208, 11305, 11306, 11307, 11308, 11101, 11102, 11103, 11104, 11201, 11202, 11203, 11204, 11301, 11302, 11303, 11304 and house panel}
05/27/2022 COT - LCEL - Construction Power Passed {Activity date: 05/27/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved ok for clearance ECO for the following units
11105, 11106, 11107, 11108, 11205, 11206, 11207, 11208, 11305, 11306, 11307, 11308
11101, 11102, 11103, 11104, 11201, 11202, 11203, 11204, 11301, 11302, 11303, 11304 and house panel

}
06/17/2022 COT - LCPL - Sewer Passed {Activity date: 06/17/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 02/24/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Partial approval awaiting manholes

} ; {Activity date: 02/18/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by RSALDAT1 - Partial please expose clean out}
10/03/2022 COT - FCON - Alarm - Final Passed {Activity date: 10/03/2022; Status: Approved; Inspector: wmotto; Comment: Entered by WMOTTO1 - }
10/03/2022 COT - FCON - Sprinkler - Final Passed {Activity date: 10/03/2022; Status: Approved; Inspector: wmotto; Comment: Entered by WMOTTO1 - }
10/03/2022 COT - FCON - Fire - Final Passed {Activity date: 10/03/2022; Status: Approved; Inspector: wmotto; Comment: Entered by WMOTTO1 - }
10/14/2022 COT - LCBU - Building Final Passed {Activity date: 10/14/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
10/14/2022 COT - LCME - Mechanical Final Passed {Activity date: 10/14/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 10/03/2022; Status: Partial Approval; Inspector: RSHERRY; Comment: Entered by RSHERRY1 - REVIEW OF AIR BALANCE REPORT COMPLETED} ; {Activity date: 01/06/2021; Status: Prior to Final Inspectn; Inspector: RSHERRY; Comment: Entered by RSHERRY1 - AIR BALANCE REPORT REQUIRED}
10/14/2022 COT - LCPL - Plumbing Roof Drains Passed {Activity date: 10/14/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 05/18/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Partial approval awaiting final
}
10/14/2022 COT - LCEL - Outdoor Lighting Passed {Activity date: 10/14/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
10/14/2022 COT - LCEL - Electrical Final Passed {Activity date: 10/14/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
10/14/2022 COT - LCPL - Plumbing Final Passed {Activity date: 10/14/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 09/26/2022; Status: Partial Approval; Inspector: RSHERRY; Comment: Entered by RSHERRY1 - REVIEW OF WATER DISINFECTION REPORT COMPLETED} ; {Activity date: 01/21/2021; Status: Prior to Final Inspectn; Inspector: G.Koziol; Comment: Entered by PCAMARE1 - SWR_SAGUARO TRAILS SQ20172860622 PTN BLK 2 & ELY PTN BLK 3
ENCANTADA AT SAGUARO TRAILS - BUILDING #11 - ISSUED WITH TYPE III CAPACITY #P20-WC00071 - CONNECTING TO ON-SITE PRIVATE SEWER PER COT PERMIT #T20CM05696 AND PER PDEQ CONSTRUCTION AUTHORIZATION #P20SD00044 DATED 9/11/20 - ISSUED WITH PDEQ CONDITIONS: NO FINAL AND NO CERTIFICATE OF OCCUPANCY UNTIL PDEQ ISSUES THE DISCHARGE AUTHORIZATION FOR THE PRIVATE SEWER #P20SD00044 - ISSUED WITH PCRWRD CONDITIONS: NO FINAL AND NO CERTIFICATE OF OCCUPANCY UNTIL THE PUBLIC SEWER G-2020-040 (P20SD00047/P20WI00032) IS ACCEPTED AND RELEASED BY PCRWRD} ; {Activity date: 01/06/2021; Status: Prior to Final Inspectn; Inspector: RSHERRY; Comment: Entered by RSHERRY1 - WATER DISINFECTION REPORT REQUIRED}
10/14/2022 COT - HCBU - Interior Shear Bracing Passed {Activity date: 10/14/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 07/22/2022; Status: Partial Approval; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - PA. 1st floor} ; {Activity date: 07/18/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Partial approval for 2nd and third floor only ok to tape

}

Documents

File Name Document Type  
5. ESN_210816_INSULATION CERTIFICATE_BLDG11 2022-08-16 - UPLOADED FILE TYPE OTHER 1 (1).PDF DOCUMENTS VIEW
6. ESN_210816_STUCCO CERTIFICATE_BLDG11 2022-08-16 - UPLOADED FILE TYPE OTHER 1 (1).PDF DOCUMENTS VIEW
2021-11-01 - UPDATE TO T21CM08500.PDF DOCUMENTS VIEW
ADDRESS CHANGE 2021-11-01 - UPLOADED FILE TYPE SUPPORTINGDOCUMENTS 1.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
ESN-TCO_221014_REQUEST_FORM_BUILDING11.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLAN SET REV2.PDF DOCUMENTS VIEW
REVISION LETTER.PDF DOCUMENTS VIEW
SIC.PDF DOCUMENTS VIEW
STRUCTURAL CALCS.PDF DOCUMENTS VIEW
TCO T20CM08500.PDF DOCUMENTS VIEW
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
DEFERRED TRUSS SUB LETTER DOCUMENTS VIEW
REV1_BLDG B FLOOR TRUSS CALCS DOCUMENTS VIEW
REV1_BLDG B ROOF TRUSS CALCS DOCUMENTS VIEW
REV1_BLDG B FLOOR LAYOUT PLANS CONSTRPLANS VIEW
REV1_PLAN SET CONSTRPLANS VIEW
CONTRACTOR LETTER.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
SPECIAL INSPECTION CERT.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PLAN SET CONSTRPLANS VIEW
SEWER AND WATER PLANS CONSTRPLANS VIEW