Status:
Complete
Type:
Commercial Building
Apply Date:
12/04/2020
Applicant:
Thomas Garrett
Description:
3-STORY APRT BLDG ESTMODELB T20-M0022

Permit Reviews

Permit Number - T20CM08499
Permit Status: Complete
Permit Description: 3-STORY APRT BLDG ESTMODELB T20-M0022
Start Date Submittal Complete Date Status  
01/12/2021 RESUBMITTAL 01/21/2021 COMPLETED Review Details
04/05/2021 REVISION - - 1ST 04/16/2021 COMPLETED Review Details
08/03/2021 REVISION - - 2ND 08/11/2021 COMPLETED Review Details
11/30/2020 COMMERCIAL - NEW 01/12/2021 COMPLETED Review Details
11/14/2022 COMMERCIAL REVIEW - FULL v.1 11/16/2022 APPROVED Review Details

Conditions

Permit Number - T20CM08499
Permit Status: Complete
Permit Description: 3-STORY APRT BLDG ESTMODELB T20-M0022
Date Description Comments
11/14/2022 AIR BALANCING/COMMISSIONING REPORT IS REQUIRED.
12/04/2020 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
04/15/2021 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
04/15/2021 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
03/13/2022 SPECIAL INSPECTION FORMS AND REPORTS REQUIRED PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY.
12/04/2020 SPECIAL INSPECTION FOR CONCRETE IS REQUIRED..
03/13/2022 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
03/13/2022 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
12/04/2020 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
11/14/2022 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: T20CM08499
Permite Description: 3-STORY APRT BLDG ESTMODELB T20-M0022
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
10/26/2022 COT - LCME - Mechanical Final N/A Not Ready
10/27/2022 COT - LCEL - Electrical Final N/A Not Ready
10/26/2022 COT - LCPL - Plumbing Final N/A Not Ready

Completed Inspections

Permit Status: Complete
Permit Number: T20CM08499
Permit Description: 3-STORY APRT BLDG ESTMODELB T20-M0022
Total Completed Inspections - 28
Date Description Inspector Results Comments
04/15/2021 COT - LCBU - Roof Nailing Passed {Activity date: 04/15/2021; Status: Approved; Inspector: ENEWCOMB; Comment: Entered by ENEWCOM1 - }
06/14/2021 COT - LCPL - Yard Water Line Passed {Activity date: 06/14/2021; Status: Approved; Inspector: RCHANDLER; Comment: Entered by VLEON1 - }
06/18/2021 COT - LCPL - Rough Soil Passed {Activity date: 06/18/2021; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VLEON1 - }
09/07/2021 COT - LCEL - Electrical Underground Passed {Activity date: 09/07/2021; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by RSALDAT1 - Approved}
09/07/2021 COT - LCBU - Excavation/Rebar/Zoning Passed {Activity date: 09/07/2021; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by RSALDAT1 - Approved}
09/07/2021 COT - LCBU - Preslab Passed {Activity date: 09/07/2021; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by RSALDAT1 - Approved}
09/07/2021 COT - LCEL - Grounding/Bonding Passed {Activity date: 09/07/2021; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by RSALDAT1 - Approved}
06/03/2022 COT - LCBU - Exterior Clips/Sheathing Passed {Activity date: 06/03/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 03/02/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Partial approval for 1st floor only

}
06/15/2022 COT - LCEL - Electrical Intermediate Passed {Activity date: 06/15/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved}
06/15/2022 COT - LCBU - Framing Passed {Activity date: 06/15/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved} ; {Activity date: 05/17/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Partial approval for roof nailing

} ; {Activity date: 03/31/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Partial approval for 3rd floor floor nailing} ; {Activity date: 02/25/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Partial approval for second floor nailing}
06/15/2022 COT - LCPL - Plumbing Intermediate Passed {Activity date: 06/15/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved}
06/15/2022 COT - HCBU - Exterior Clips/Sheathing Passed {Activity date: 06/15/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved}
06/15/2022 COT - LCBU - Sustainability Passed {Activity date: 06/15/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved}
06/15/2022 COT - LCEL - Electrical Above Ceiling Passed {Activity date: 06/15/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved}
06/15/2022 COT - LCME - Mechanical Intermediate Passed {Activity date: 06/15/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved}
06/17/2022 COT - LCBU - Building Above Ceiling Passed {Activity date: 06/17/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 06/15/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Partial approval
}
06/17/2022 COT - LCBU - Firewall/Fire Barrier/Firestop Passed {Activity date: 06/17/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 06/15/2022; Status: Not ready for Inspection; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Not ready
}
07/01/2022 COT - LCEL - Construction Power Passed {Activity date: 07/01/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - APPROVED OK FOR CLEARANCE ECO BUILDING 9 UNITS;
9108, 9107, 9305, 9106, 9206, 9306, 9107, 9208, 9307, 9105, 9205, 9308, HOUSE PANEL, 9103, 9102, 9201, 9303, 9101, 9204, 9208, 9302, 9104, 9202, 9304, 9301

}
08/25/2022 COT - LCPL - Plumbing Roof Drains Passed {Activity date: 08/25/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} ; {Activity date: 06/15/2022; Status: Not ready for Inspection; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Not ready
}
08/25/2022 COT - LCPL - Sewer Passed {Activity date: 08/25/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - V}
08/25/2022 COT - HCBU - Interior Shear Bracing Passed {Activity date: 08/25/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} ; {Activity date: 08/09/2022; Status: Partial Approval; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - PA
2nd & 3rd floor sheer walls}
09/30/2022 PDSD Building Division - TEP PM Clearance Passed {Activity date: 09/30/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by RSALDAT1 - CODE ECO/UNIT 9207} ; {Activity date: 07/01/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - CODE ECO/BUILDING 9 UNITS;
9108, 9107, 9305, 9106, 9206, 9306, 9107, 9208, 9307, 9105, 9205, 9308, HOUSE PANEL, 9103, 9102, 9201, 9303, 9101, 9204, 9208, 9302, 9104, 9202, 9304, 9301

}
11/04/2022 COT - LCBU - Building Final Passed
11/04/2022 COT - LCEL - Outdoor Lighting Passed
11/07/2022 COT - FCON - Alarm - Final Passed
11/07/2022 COT - FCON - Sprinkler - Final Passed
11/07/2022 COT - FCON - Fire - Final Passed
11/15/2022 COT - LCBU - CofO Passed

Documents

File Name Document Type  
5. ESN_210816_INSULATION CERTIFICATE_BLDG09 2022-08-16 - UPLOADED FILE TYPE OTHER 1.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLAN SET REV2.PDF DOCUMENTS VIEW
REVISION LETTER.PDF DOCUMENTS VIEW
SIC.PDF DOCUMENTS VIEW
STRUCTURAL CALCS.PDF DOCUMENTS VIEW
6. ESN_211027_STUCCO CERTIFICATE_BLDG09_V1.PDF DOCUMENTS VIEW
7. ESN_221027_CHLORINATION TEST RESULTS_BLDG09_V1.PDF DOCUMENTS VIEW
8. ESN_221028_AIR BALANCE RESULTS_BLDG09_V1.PDF DOCUMENTS VIEW
9. ESN_221109_CIVIL GRADING LETTER_BLDG09_ENGINEERS CONFORMANCE LTR_V1.PDF DOCUMENTS VIEW
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
CONS-3. ESN_200522_FINAL STAMPED AND SIGNED SPECIAL INSPECTION FORM_BLDG09_V1.PDF DOCUMENTS VIEW
ESN-TCO_221107_REQUEST_FORM_BUILDING09_V1.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
DEFERRED TRUSS LETTER DOCUMENTS VIEW
REV1_BLDG B FLOOR TRUSS CALCS DOCUMENTS VIEW
REV1_BLDG B ROOF TRUSS CALCS DOCUMENTS VIEW
REV1_BLDG B FLOOR LAYOUT PLANS CONSTRPLANS VIEW
REV1_PLAN SET CONSTRPLANS VIEW
APPLICATION.PDF DOCUMENTS VIEW
SEWER AND WATER PLANS.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
CONTRACTOR LETTER.PDF DOCUMENTS VIEW
SPECIAL INSPECTION CERT.PDF DOCUMENTS VIEW
PLAN SET.PDF CONSTRPLANS VIEW