Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Address NEW:
367 S CRAYCROFT RD
Apply Date:
11/09/2020
Applicant:
Earl Yousey
Description:
Enclose carport and addition for master bedroom, master bath, and porch

Permit Reviews

Permit Number - T20CM07878
Permit Status: Issued
Permit Description: Enclose carport and addition for master bedroom, master bath, and porch
Start Date Submittal Complete Date Status  
11/09/2020 RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO 01/04/2021 COMPLETED Review Details

Outstanding Inspections

Permit Status: Issued
Permit Number: T20CM07878
Permite Description: Enclose carport and addition for master bedroom, master bath, and porch
Total Outstanding Inspections - 13
Last Inspection Date Description Inspector Results Comments
11/04/2022 COT - RSME - Mechanical Final N/A Canceled Inspection Canceled
11/04/2022 COT - LCBU - Framing N/A Canceled Inspection Canceled
11/04/2022 COT - LCPL - Plumbing Intermediate N/A Canceled Inspection Canceled
11/04/2022 COT - RSEL - Electrical Underground N/A Canceled Inspection Canceled
11/04/2022 COT - RSPL - Plumbing Final N/A Canceled Inspection Canceled
11/04/2022 COT - RSEL - Construction Power N/A Canceled Inspection Canceled
11/04/2022 RSME - Mechanical Progress N/A Canceled Inspection Canceled
11/04/2022 COT - RSBU - Excavation/Rebar/Zoning N/A Canceled Inspection Canceled
11/04/2022 COT - RSEL - Electrical Final N/A Canceled Inspection Canceled
09/01/2023 COT - RSPL - Rough Soil N/A Partial Pass 9/1/23: underground plumbing is in a different location than plans, revision submitted proceed at own risk
09/01/2023 COT - RSPL - Sewer N/A Partial Pass 9/1/23: sewer connection is in a different location than plans, revision submitted proceed at own risk
09/15/2023 COT - RSBU - Preslab N/A Partial Pass 9/15/23: rebar per plan ok to pour from car port to master suite,
12/04/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Re-inspection required 12/4/23: fire foam all penetrations through top plate. Move duct work away from can lighting. Plumbing needs to be under test. Add receptacle to living room area

Completed Inspections

Permit Status: Issued
Permit Number: T20CM07878
Permit Description: Enclose carport and addition for master bedroom, master bath, and porch
Total Completed Inspections - 7
Date Description Inspector Results Comments
09/01/2023 COT - RSPL - Yard Water Line Passed
09/15/2023 COT - RSEL - Grounding/Bonding Passed
10/02/2023 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
10/02/2023 COT - RSBU - Roof Nailing Passed
12/05/2023 RSBU - Building Progress Passed 12/5/23: okay to cover walls intermediates have passed
05/07/2024 COT - RSPL - Gas Pressure Test Passed
05/06/2025 RSBU - Building Final Passed Passed final 5/6/25

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW