Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Expired
Type:
Commercial Building
Address NEW:
3227 N PALO VERDE AV
Apply Date:
10/27/2020
Applicant:
Kathy Nieto
Description:
PARK N SHADE

Permit Reviews

Permit Number - T20CM07402
Permit Status: Expired
Permit Description: PARK N SHADE
Start Date Submittal Complete Date Status  
01/06/2021 RESUBMITTAL 02/08/2021 COMPLETED Review Details
02/16/2021 RESUBMITTAL 03/17/2021 COMPLETED Review Details
04/07/2021 RESUBMITTAL 04/19/2021 COMPLETED Review Details
09/23/2021 RESUBMITTAL 10/19/2021 COMPLETED Review Details
10/27/2020 COMMERCIAL - BLDG/FIRE/ZONING/ENG 12/14/2020 COMPLETED Review Details
10/27/2020 RESUBMITTAL 12/21/2020 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T20CM07402
Permit Status: Expired
Permit Description: PARK N SHADE
Total Outstanding Activity Conditions - 6
Date Name
10/27/2020 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
11/25/2020 SPECIAL INSPECTION FORMS AND REPORTS REQUIRED PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY.
11/25/2020 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
11/25/2020 SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED.
11/25/2020 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
12/15/2020 SPECIAL INSPECTION FOR PILING, DRILLED PIERS AND CAISSONS IS REQUIRED.

Completed Inspections

Permit Status: Expired
Permit Number: T20CM07402
Permit Description: PARK N SHADE
Total Completed Inspections - 4
Date Description Inspector Results Comments
11/22/2021 COT - LCBU - Excavation/Rebar/Zoning Passed {Activity date: 11/22/2021; Status: Approved; Inspector: DQUINN; Comment: Entered by RSALDAT1 - Ap
4 I-beam column footings ok to pour to 11 ft.}
12/09/2021 COT - LCBU - Framing Passed {Activity date: 12/09/2021; Status: Approved; Inspector: DQUINN; Comment: Entered by RSALDAT1 - Ap}
03/24/2022 COT - LCBU - Building Final Passed {Activity date: 03/24/2022; Status: Partial Approval; Inspector: DQUINN; Comment: Entered by VVERA1 - APPROVED BY INSPECTOR AWAITING CONDITIONS} ; {Activity date: 03/24/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by VVERA1 - Pa

Please Ap 1090 and close the permit, when Eng is Ap.
} ; {Activity date: 12/09/2021; Status: Partial Approval; Inspector: DQUINN; Comment: Entered by RSALDAT1 - pa
Need engineering sign off to be able to approve 1090 and close the permit.}
03/24/2022 ENGR Engineering Final Passed {Activity date: 03/24/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by VVERA1 - IS APPROVED

}

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
STRUCTURAL CALCS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
STRUCTURAL DRAWING 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW
STRUCTURAL CALCS.PDF DOCUMENTS VIEW
STRUCTURAL DRAWING.PDF DOCUMENTS VIEW