Permit Details

Status:
Final
Type:
SINGLE FAMILY NEW
Apply Date:
10/13/2020
Applicant:
LENNAR ARIZONA CONSTRUCTION INC **APA**
Description:
SFR LENNVC453 T20-M0036
Contractors:
  • LENNAR ARIZONA CONSTRUCTION INC **APA**

Permit Reviews

Permit Number - T20CM07033
Permit Status: Final
Permit Description: SFR LENNVC453 T20-M0036
Start Date Submittal Complete Date Status  
09/30/2020 RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO 10/29/2020 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T20CM07033
Permit Status: Final
Permit Description: SFR LENNVC453 T20-M0036
Total Outstanding Activity Conditions - 1
Date Name
10/13/2020 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: Final
Permit Number: T20CM07033
Permit Description: SFR LENNVC453 T20-M0036
Total Completed Inspections - 23
Date Description Inspector Results Comments
10/29/2020 PLUMBING - FINAL G Koziol Approved SWR_VALENCIA CROSSING NBRHDS 3 & 4 LOT 140 SQ20192910572
SFR - BACKWATER VALVE REQUIRED - ISSUED WITH PCRWRD CONDITIONS: NO FINAL UNTIL THE PUBLIC SEWER G-2018-057 IS ACCEPTED AND RELEASED BY PCRWRD
10/30/2020 PLUMBING - SEWER HCS CONNECT DMUNIZ Approved Partial, Waste line, Tracer and clean outs stubbed out of slab (No Sewer Connection)
10/30/2020 PLUMBING - YARD WTR LINE/TEST DMUNIZ Approved Partial, Line and tracer installed no meter.
10/30/2020 PLUMBING - ROUGH, SOIL DMUNIZ Approved
11/13/2020 ELECTRIC - UNDERGROUND DMUNIZ Approved
11/13/2020 ELECTRIC - UFER DMUNIZ Approved
11/13/2020 BUILDING PRE-SLAB DMUNIZ Approved
11/13/2020 EXCAVATION/LAYOUT REBAR & ZON DMUNIZ Approved
12/04/2020 ROOF NAILING DMUNIZ Approved
12/04/2020 EXT METAL CLIPS/EXT SHEATHING DMUNIZ Approved
01/13/2021 TEP CLEARANCE - PM WGALLAGHER Approved CODE ECO
01/13/2021 ELECTRIC - CONSTRUCTION POWER WGALLAGHER Approved APPROVED
01/20/2021 MECHANICAL - INTERMEDIATE WGALLAGHER Approved APPROVED
01/20/2021 PLUMBING - GAS PRESSURE TEST WGALLAGHER Approved APPROVED
01/20/2021 PLUMBING - INTERMEDIATE WGALLAGHER Approved APROVED
01/20/2021 RESIDENTIAL INTERMEDIATE WGALLAGHER Approved APPROVED
01/20/2021 FRAMING WGALLAGHER Approved APPROVED
02/04/2021 SHEET ROCK NAILING WGALLAGHER Approved APPROVED
03/15/2021 GAS CLEARANCE WGALLAGHER Approved CODE
04/26/2021 MECHANICAL - FINAL WGALLAGHER Approved
04/26/2021 OUTDOOR LIGHTING FINAL WGALLAGHER Approved
04/26/2021 ELECTRIC - FINAL WGALLAGHER Approved
04/26/2021 BUILDING - FINAL WGALLAGHER Approved

Documents

File Name Document Type  
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
SEWER PERMIT.PDF DOCUMENTS VIEW
SIC.PDF DOCUMENTS VIEW
SITE PLAN.PDF DOCUMENTS VIEW