Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
10/12/2020
Applicant:
Thomas Garrett
Description:
NEW MAINTENANCE BLDG FOR MULTI FAMILY DEVELOPMENT DP20-0080

Permit Reviews

Permit Number - T20CM06983
Permit Status: Complete
Permit Description: NEW MAINTENANCE BLDG FOR MULTI FAMILY DEVELOPMENT DP20-0080
Start Date Submittal Complete Date Status  
02/05/2021 RESUBMITTAL 05/13/2021 COMPLETED Review Details
10/12/2020 3RD PARTY REVIEW - COMMERCIAL 11/04/2020 COMPLETED Review Details
12/09/2020 RESUBMITTAL 01/08/2021 COMPLETED Review Details
11/14/2022 COMMERCIAL REVIEW - FULL v.1 11/16/2022 APPROVED Review Details

Conditions

Permit Number - T20CM06983
Permit Status: Complete
Permit Description: NEW MAINTENANCE BLDG FOR MULTI FAMILY DEVELOPMENT DP20-0080
Date Description Comments
10/12/2020 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
03/13/2022 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
03/13/2022 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
03/13/2022 SPECIAL INSPECTION FORMS AND REPORTS REQUIRED PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY.
03/13/2022 SPECIAL INSPECTION FOR CONCRETE IS REQUIRED..
03/13/2022 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
03/13/2022 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
03/13/2022 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
09/14/2022 AIR BALANCE REPORT REQUIRED

Outstanding Inspections

Permit Status: Complete
Permit Number: T20CM06983
Permite Description: NEW MAINTENANCE BLDG FOR MULTI FAMILY DEVELOPMENT DP20-0080
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
11/14/2022 PDSD Site/Engineering Division - NPPO N/A Complete (Recurring) Contractor will call in another inspection for tomorrow for a final
11/10/2022 ENGR Engineering Final N/A Complete (Recurring) Landscape is not completed and building 10 is not completed reinspect on Monday
10/26/2022 COT - LCPL - Rough Soil N/A Not Ready
10/26/2022 COT - LCPL - Plumbing Final N/A Not Ready

Completed Inspections

Permit Status: Complete
Permit Number: T20CM06983
Permit Description: NEW MAINTENANCE BLDG FOR MULTI FAMILY DEVELOPMENT DP20-0080
Total Completed Inspections - 32
Date Description Inspector Results Comments
06/21/2021 COT - LCPL - Yard Water Line Passed {Activity date: 06/21/2021; Status: Approved; Inspector: RCHANDLER; Comment: Entered by RSALDAT1 - AP}
10/22/2021 COT - LCEL - Electrical Underground Passed {Activity date: 10/22/2021; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved}
10/22/2021 COT - LCBU - Excavation/Rebar/Zoning Passed {Activity date: 10/22/2021; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved}
10/22/2021 COT - LCBU - Preslab Passed {Activity date: 10/22/2021; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved}
02/18/2022 COT - LCPL - Sewer Passed {Activity date: 02/18/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by RSALDAT1 - Approved

}
03/15/2022 COT - LCBU - Exterior Clips/Sheathing Passed {Activity date: 03/15/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved}
03/15/2022 COT - LCBU - Roof Nailing Passed {Activity date: 03/15/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved}
04/15/2022 COT - LCBU - Building Above Ceiling Passed {Activity date: 04/15/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved}
04/15/2022 COT - LCEL - Electrical Intermediate Passed {Activity date: 04/15/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved}
04/15/2022 COT - LCBU - Framing Passed {Activity date: 04/15/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved} ; {Activity date: 03/15/2022; Status: Not ready for Inspection; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Not ready please call with intermediate inspections}
04/15/2022 COT - LCME - Mechanical Above Ceiling Passed {Activity date: 04/15/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved}
04/15/2022 COT - LCPL - Plumbing Intermediate Passed {Activity date: 04/15/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved}
04/15/2022 COT - LCPL - Plumbing Above Ceiling Passed {Activity date: 04/15/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved}
04/15/2022 COT - LCEL - Electrical Above Ceiling Passed {Activity date: 04/15/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved}
04/15/2022 COT - LCME - Mechanical Intermediate Passed {Activity date: 04/15/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved}
05/12/2022 PDSD Building Division - TEP PM Clearance Passed {Activity date: 05/12/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - CODE ECO/MAINTENCE BLD}
05/12/2022 COT - LCEL - Service Upgrade Passed {Activity date: 05/12/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - . Approved. The TEP clearance code is ECO. Maintenance building.} ; {Activity date: 03/22/2022; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Partial approval for conduit from transformer to building, ok to cover

}
11/09/2022 TRSP - ROW - Final/Close-Out Passed
11/10/2022 PDSD Site/Engineering Division - Landscaping Passed
11/10/2022 COT - LCBU - Building Final Passed
11/10/2022 COT - LCPL - Plumbing Progress Passed
11/10/2022 COT - LCME - Mechanical Final Passed
11/10/2022 COT - LCME - Mechanical Progress Passed
11/10/2022 COT - LCEL - Outdoor Lighting Passed
11/10/2022 COT - LCEL - Electrical Final Passed
11/10/2022 COT - LCPL - Medical Gas Preconstruction Mtg Passed
11/10/2022 COT - LCPL - Rough Soil Passed
11/21/2023 COT - FCON - Fire - Final Passed
11/10/2022 PDSD Building Division - Sign Final Passed
11/10/2022 COT - LCBU - Building Progress Passed
11/10/2022 COT - LCPL - Plumbing Final Passed
11/10/2022 COT - HCBU - Interior Shear Bracing Passed

Documents

File Name Document Type  
5. ESN_210816_INSULATION CERTIFICATE_BLDG16 2022-08-16 - UPLOADED FILE TYPE OTHER 1 (1).PDF DOCUMENTS VIEW
SIC.PDF DOCUMENTS VIEW
3. ESN_200522_FINAL STAMPED AND SIGNED SPECIAL INSPECTION FORM_BLDG16_V1.PDF DOCUMENTS VIEW
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
STANTEC APPROVAL LETTER FOR TRUSSES DOCUMENTS VIEW
REV1_STANTEC APPROVAL LETTER DOCUMENTS VIEW
DEFERRED TRUSS PLAN DOCUMENTS VIEW
CALCS.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
GEOTECH REPORT.PDF DOCUMENTS VIEW
ENVELOPE COMP CERT.PDF DOCUMENTS VIEW
CONTRACTOR LETTER.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
HVAC LOAD CALCS.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
OUTDOOR LIGHTING SPECIAL INSPECTION.PDF DOCUMENTS VIEW
MECH COMP CERT.PDF DOCUMENTS VIEW
PRO SERVICE AGREEMENT.PDF DOCUMENTS VIEW
UPDATE APPLICATION.PDF DOCUMENTS VIEW
SPECIAL INSPECTION CERT.PDF DOCUMENTS VIEW
SEWER PERMIT.PDF DOCUMENTS VIEW
PLAN SET CONSTRPLANS VIEW