Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Commercial Building
Apply Date:
10/05/2020
Applicant:
David Gainey
Description:
NEW CHURCH

Permit Reviews

Permit Number - T20CM06844
Permit Status: Issued
Permit Description: NEW CHURCH
Start Date Submittal Complete Date Status  
09/29/2020 COMMERCIAL - NEW 11/12/2020 COMPLETED Review Details
12/08/2020 RESUBMITTAL 01/14/2021 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T20CM06844
Permit Status: Issued
Permit Description: NEW CHURCH
Total Outstanding Activity Conditions - 11
Date Name
10/05/2020 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
11/09/2020 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
11/09/2020 SPECIAL INSPECTION FORMS AND REPORTS REQUIRED PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY.
11/09/2020 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
11/09/2020 SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED.
11/09/2020 SPECIAL INSPECTION FOR SPECIAL MOMENT RESISTING STEEL FRAMES IS REQUIRED.
11/09/2020 SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED.
11/09/2020 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
11/09/2020 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
11/09/2020 SPECIAL INSPECTION FOR WOOD FRAMED DIAPHRAGMS AND SHEAR WALLS IS REQUIRED.
11/09/2020 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.

Outstanding Inspections

Permit Status: Issued
Permit Number: T20CM06844
Permite Description: NEW CHURCH
Total Outstanding Inspections - 34
Last Inspection Date Description Inspector Results Comments
10/26/2022 COT - LCPL - Gas Pressure Test N/A Not Ready
10/26/2022 COT - LCBU - Building Above Ceiling N/A Not Ready
10/26/2022 COT - LCEL - Electrical Progress N/A Not Ready
10/27/2022 COT - LCBU - Building Final N/A Not Ready
10/26/2022 COT - LCEL - Electrical Intermediate N/A Not Ready
10/27/2022 COT - LCBU - Framing N/A Not Ready
10/26/2022 COT - LCEL - Electrical Underground N/A Not Ready
10/26/2022 COT - LCBU - Excavation/Rebar/Zoning N/A Not Ready
10/26/2022 COT - LCEL - Construction Power N/A Not Ready
10/26/2022 COT - LCPL - Plumbing Roof Drains N/A Not Ready
10/26/2022 COT - LCME - Kitchen Hood N/A Not Ready
10/26/2022 COT - LCEL - Outdoor Lighting N/A Not Ready
10/26/2022 COT - LCBU - Preslab N/A Not Ready
10/27/2022 COT - LCPL - Plumbing Intermediate N/A Not Ready
10/26/2022 COT - FCON - Alarm - Final N/A Not Ready
10/27/2022 COT - LCEL - Electrical Final N/A Not Ready
10/26/2022 COT - FCON - Sprinkler - Final N/A Not Ready
10/26/2022 COT - HCBU - Exterior Clips/Sheathing N/A Not Ready
10/26/2022 COT - LCBU - Exterior Clips/Sheathing N/A Not Ready
10/26/2022 COT - LCBU - Sustainability N/A Not Ready
10/26/2022 COT - LCEL - Temporary Service N/A Not Ready
10/26/2022 COT - LCPL - Rough Soil N/A Not Ready
10/26/2022 COT - FCON - Fire - Final N/A Not Ready
10/26/2022 COT - LCEL - Electrical Above Ceiling N/A Not Ready
10/26/2022 COT - LCME - Mechanical Intermediate N/A Not Ready
10/26/2022 COT - LCBU - Roof Nailing N/A Not Ready
10/26/2022 COT - LCPL - Yard Water Line N/A Not Ready
10/26/2022 COT - LCPL - Sewer N/A Not Ready
10/26/2022 COT - LCBU - CofO N/A Not Ready
10/26/2022 COT - LCEL - Grounding/Bonding N/A Not Ready
10/26/2022 COT - LCME - Mechanical Final N/A Not Ready
10/26/2022 COT - LCBU - Building Progress N/A Not Ready
10/26/2022 COT - LCPL - Plumbing Final N/A Not Ready
08/08/2024 ENGR Engineering Final N/A Not Ready Drove too the site to see if any work has started on this site, nothing happening at this time. I will contact the Engineer of Record and see what is happening with this project.

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
ENERGY CALC 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
FUGITIVE DUST PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
GEO REPORT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
LETTER OF INTENT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
MECH CHECK AC 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SIC 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
STRUC CALCS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SYSTEMS DESIGN REPORT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
ENERGY CALC.PDF DOCUMENTS VIEW
FUGITIVE DUST PERMIT.PDF DOCUMENTS VIEW
GEO REPORT.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
LETTER OF INTENT.PDF DOCUMENTS VIEW
MECH CHECK AC.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW
SIC.PDF DOCUMENTS VIEW
STRUC CALCS.PDF DOCUMENTS VIEW
SYSTEMS DESIGN REPORT.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW