Permit: T20CM06687
Permit Details
Apply Date:
09/26/2020
Applicant:
Description:
NEW 46700 SF MEDICAL OFFICE BUILDING CORE AND SHELL PACKAGE
Permit Reviews
Permit Number - T20CM06687
Permit Status: Expired
Permit Description: NEW 46700 SF MEDICAL OFFICE BUILDING CORE AND SHELL PACKAGE
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/20/2021 | RESUBMITTAL | 02/12/2021 | COMPLETED |
02/12/2021 | RESUBMITTAL | 02/22/2021 | COMPLETED |
09/21/2020 | COMMERCIAL - NEW | 11/10/2020 | COMPLETED |
11/19/2021 | REVISION - - 1ST | 12/16/2021 | COMPLETED |
12/02/2020 | RESUBMITTAL - TI ALL | 01/20/2021 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T20CM06687
Permit Status: Expired
Permit Description: NEW 46700 SF MEDICAL OFFICE BUILDING CORE AND SHELL PACKAGE
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
09/26/2020 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Outstanding Inspections
Permit Status: Expired
Permit Number: T20CM06687
Permite Description: NEW 46700 SF MEDICAL OFFICE BUILDING CORE AND SHELL PACKAGE
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/07/2022 | COT - LCBU - Building Final | N/A | Canceled | Inspection Canceled |
11/07/2022 | COT - LCME - Mechanical Final | N/A | Canceled | Inspection Canceled |
Completed Inspections
Permit Status: Expired
Permit Number: T20CM06687
Permit Description: NEW 46700 SF MEDICAL OFFICE BUILDING CORE AND SHELL PACKAGE
Total Completed Inspections - 33
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/27/2021 | COT - LCPL - Sewer | Passed | {Activity date: 04/27/2021; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VLEON1 - Approved. From building to manhole #6 according to M.J. Harris plans.} | |
08/25/2021 | PDSD Building Division - TEP PM Clearance | Passed | {Activity date: 08/25/2021; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - CODE ECO} | |
11/22/2021 | COT - LCPL - Gas Pressure Test | Passed | {Activity date: 11/22/2021; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved. Southwest gas clearance is required.} | |
11/22/2021 | COT - BULD - SWG Clearance | Passed | {Activity date: 11/22/2021; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - CODE GAS} | |
01/18/2022 | COT - LCPL - Yard Water Line | Passed | {Activity date: 01/18/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Approved} ; {Activity date: 06/17/2021; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VLEON1 - } ; {Activity date: 05/05/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VLEON1 - Partial. From the buildings fire riser/plumbing room to back flow preventer to service tap on 6 inch fire line. } |
|
01/20/2022 | COT - FCON - Alarm - Final | Passed | {Activity date: 01/20/2022; Status: Approved; Inspector: wmotto1; Comment: Entered by WMOTTO1 - } | |
01/20/2022 | COT - FCON - Sprinkler - Final | Passed | {Activity date: 01/20/2022; Status: Approved; Inspector: wmotto1; Comment: Entered by WMOTTO1 - } | |
02/01/2022 | COT - LCBU - Building Above Ceiling | Passed | {Activity date: 02/01/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - 4090, 1005, 3005, 1020, 1025. 1075, 2010, 2061, 2085, 3035, 1035, 1036, 1044, 2036, 3036, 4036, 2035. 3090, 1030, 1040, 1041, 2005, 2060, 2090, 2099, 4035. Approved. See permit number T21CM00360.} ; {Activity date: 12/01/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - . Partial. Level two. Corridor‘s and lobby } ; {Activity date: 11/18/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Partial. Level one. Center, Corridor and south Corridor } ; {Activity date: 08/24/2021; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by RSALDAT1 - Partial approval For the first floor entry in lobby area only } |
|
02/01/2022 | COT - LCEL - Electrical Intermediate | Passed | {Activity date: 02/01/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - 4090, 1005, 3005, 1020, 1025. 1075, 2010, 2061, 2085, 3035, 1035, 1036, 1044, 2036, 3036, 4036, 2035. 3090, 1030, 1040, 1041, 2005, 2060, 2090, 2099, 4035. Approved. See permit number T21CM00360.} ; {Activity date: 12/15/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Partial. Canopy lighting.} | |
02/01/2022 | COT - LCBU - Framing | Passed | {Activity date: 02/01/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - 4090, 1005, 3005, 1020, 1025. 1075, 2010, 2061, 2085, 3035, 1035, 1036, 1044, 2036, 3036, 4036, 2035. 3090, 1030, 1040, 1041, 2005, 2060, 2090, 2099, 4035. Approved. See permit number T21CM00360.} ; {Activity date: 11/10/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Partial. South side canopy.} | |
02/01/2022 | COT - LCEL - Electrical Underground | Passed | {Activity date: 02/01/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - 4090, 1005, 3005, 1020, 1025. 1075, 2010, 2061, 2085, 3035, 1035, 1036, 1044, 2036, 3036, 4036, 2035. 3090, 1030, 1040, 1041, 2005, 2060, 2090, 2099, 4035. Approved. See permit number T21CM00360.} ; {Activity date: 08/19/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Partial. Conduit lines (1”) in East parking lot for 3 light poles. Ok to cover progress areas. } ; {Activity date: 07/14/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Partial. 10 4 inch conduit lines, approximately 20 feet from the building going west approximately 60 feet to transformer.} ; {Activity date: 03/31/2021; Status: Cancelled; Inspector: ESTEVENS; Comment: Entered by VLEON1 - CANCELLED BY CONTRACTOR} ; {Activity date: 03/25/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VLEON1 - Partial. From the south side under slab to approximately 150 feet south.} ; {Activity date: 03/24/2021; Status: Cancelled; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Canceled by contractor.} ; {Activity date: 03/18/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VLEON1 - Partial. Electric conduits )3”-3/4”) from Electric Room at Stairwell #1 to Elevator area; approximately 90 feet. Ok to cover progress areas.} ; {Activity date: 03/09/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VLEON1 - Partial. From sub-electrical room#111 to sub-panels in rooms #1705 and #1632.} ; {Activity date: 03/05/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VLEON1 - Partial. From Mai electrical room going west 15 feet and going east 30 feet. Communication conduit from gridline D-4.5 to D-2.5.} |
|
02/01/2022 | COT - LCME - Mechanical Above Ceiling | Passed | {Activity date: 02/01/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - 4090, 1005, 3005, 1020, 1025. 1075, 2010, 2061, 2085, 3035, 1035, 1036, 1044, 2036, 3036, 4036, 2035. 3090, 1030, 1040, 1041, 2005, 2060, 2090, 2099, 4035. Approved. See permit number T21CM00360.} ; {Activity date: 12/01/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - . Partial. Level two. Corridor‘s and lobby } ; {Activity date: 11/18/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Partial. Level one. Center, Corridor and south Corridor } |
|
02/01/2022 | COT - LCBU - Excavation/Rebar/Zoning | Passed | {Activity date: 02/01/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - 4090, 1005, 3005, 1020, 1025. 1075, 2010, 2061, 2085, 3035, 1035, 1036, 1044, 2036, 3036, 4036, 2035. 3090, 1030, 1040, 1041, 2005, 2060, 2090, 2099, 4035. Approved. See permit number T21CM00360.} ; {Activity date: 03/09/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VLEON1 - Partial. 1st lift, 0 to 4 feet, both stairwells and elevator.} | |
02/01/2022 | COT - LCBU - Firewall/Fire Barrier/Firestop | Passed | {Activity date: 02/01/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - 4090, 1005, 3005, 1020, 1025. 1075, 2010, 2061, 2085, 3035, 1035, 1036, 1044, 2036, 3036, 4036, 2035. 3090, 1030, 1040, 1041, 2005, 2060, 2090, 2099, 4035. Approved. See permit number T21CM00360.} ; {Activity date: 12/01/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - . Partial. Level two. Corridor‘s and lobby } |
|
02/01/2022 | COT - LCEL - Construction Power | Passed | {Activity date: 02/01/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - 4090, 1005, 3005, 1020, 1025. 1075, 2010, 2061, 2085, 3035, 1035, 1036, 1044, 2036, 3036, 4036, 2035. 3090, 1030, 1040, 1041, 2005, 2060, 2090, 2099, 4035. Approved. See permit number T21CM00360.} ; {Activity date: 08/25/2021; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Partial approval for SES connections ok for clearance eco} | |
02/01/2022 | COT - LCEL - Outdoor Lighting | Passed | {Activity date: 02/01/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - 4090, 1005, 3005, 1020, 1025. 1075, 2010, 2061, 2085, 3035, 1035, 1036, 1044, 2036, 3036, 4036, 2035. 3090, 1030, 1040, 1041, 2005, 2060, 2090, 2099, 4035. Approved. See permit number T21CM00360.} | |
02/01/2022 | COT - LCPL - Plumbing Intermediate | Passed | {Activity date: 02/01/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - 4090, 1005, 3005, 1020, 1025. 1075, 2010, 2061, 2085, 3035, 1035, 1036, 1044, 2036, 3036, 4036, 2035. 3090, 1030, 1040, 1041, 2005, 2060, 2090, 2099, 4035. Approved. See permit number T21CM00360.} ; {Activity date: 10/26/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Partial. South side canopy roof drains} ; {Activity date: 09/01/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VVERA1 - 3036. Partial. Level 2. Gridlines D1 to D2.5 and H1 to H2.5. } |
|
02/01/2022 | COT - LCEL - Electrical Final | Passed | {Activity date: 02/01/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - 4090, 1005, 3005, 1020, 1025. 1075, 2010, 2061, 2085, 3035, 1035, 1036, 1044, 2036, 3036, 4036, 2035. 3090, 1030, 1040, 1041, 2005, 2060, 2090, 2099, 4035. Approved. See permit number T21CM00360.} | |
02/01/2022 | COT - HCBU - Exterior Clips/Sheathing | Passed | {Activity date: 02/01/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - 4090, 1005, 3005, 1020, 1025. 1075, 2010, 2061, 2085, 3035, 1035, 1036, 1044, 2036, 3036, 4036, 2035. 3090, 1030, 1040, 1041, 2005, 2060, 2090, 2099, 4035. Approved. See permit number T21CM00360.} | |
02/01/2022 | COT - LCBU - Exterior Clips/Sheathing | Passed | {Activity date: 02/01/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - 4090, 1005, 3005, 1020, 1025. 1075, 2010, 2061, 2085, 3035, 1035, 1036, 1044, 2036, 3036, 4036, 2035. 3090, 1030, 1040, 1041, 2005, 2060, 2090, 2099, 4035. Approved. See permit number T21CM00360.} ; {Activity date: 06/10/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VLEON1 - Partial. First and second exterior levels.} ; {Activity date: 06/01/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Partial. Dens deck on north side of roof parapet. } |
|
02/01/2022 | COT - LCPL - Plumbing Above Ceiling | Passed | {Activity date: 02/01/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - 4090, 1005, 3005, 1020, 1025. 1075, 2010, 2061, 2085, 3035, 1035, 1036, 1044, 2036, 3036, 4036, 2035. 3090, 1030, 1040, 1041, 2005, 2060, 2090, 2099, 4035. Approved. See permit number T21CM00360.} ; {Activity date: 12/01/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - . Partial. Level two. Corridor‘s and lobby } ; {Activity date: 11/18/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Partial. Level one. Center, Corridor and south Corridor } ; {Activity date: 09/01/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VVERA1 - 3036. Partial. Level 2. Gridlines D1 to D2.5 and H1 to H2.5. } |
|
02/01/2022 | COT - LCBU - Sustainability | Passed | {Activity date: 02/01/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - 4090, 1005, 3005, 1020, 1025. 1075, 2010, 2061, 2085, 3035, 1035, 1036, 1044, 2036, 3036, 4036, 2035. 3090, 1030, 1040, 1041, 2005, 2060, 2090, 2099, 4035. Approved. See permit number T21CM00360.} | |
02/01/2022 | COT - LCEL - Temporary Service | Passed | {Activity date: 02/01/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - 4090, 1005, 3005, 1020, 1025. 1075, 2010, 2061, 2085, 3035, 1035, 1036, 1044, 2036, 3036, 4036, 2035. 3090, 1030, 1040, 1041, 2005, 2060, 2090, 2099, 4035. Approved. See permit number T21CM00360.} | |
02/01/2022 | COT - LCPL - Rough Soil | Passed | {Activity date: 02/01/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - 4090, 1005, 3005, 1020, 1025. 1075, 2010, 2061, 2085, 3035, 1035, 1036, 1044, 2036, 3036, 4036, 2035. 3090, 1030, 1040, 1041, 2005, 2060, 2090, 2099, 4035. Approved. See permit number T21CM00360.} ; {Activity date: 03/19/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VLEON1 - Partial. Underground plumbing on the east side of elevators.} ; {Activity date: 03/09/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VLEON1 - Partial. All underground plumbing west of the elevator. } |
|
02/01/2022 | COT - LCEL - Electrical Above Ceiling | Passed | {Activity date: 02/01/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - 4090, 1005, 3005, 1020, 1025. 1075, 2010, 2061, 2085, 3035, 1035, 1036, 1044, 2036, 3036, 4036, 2035. 3090, 1030, 1040, 1041, 2005, 2060, 2090, 2099, 4035. Approved. See permit number T21CM00360.} ; {Activity date: 12/01/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - . Partial. Level two. Corridor‘s and lobby } ; {Activity date: 11/18/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Partial. Level one. Center, Corridor and south Corridor } ; {Activity date: 08/24/2021; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by RSALDAT1 - Partial approval For the first floor entry in lobby area only } |
|
02/01/2022 | COT - LCME - Mechanical Intermediate | Passed | {Activity date: 02/01/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - 4090, 1005, 3005, 1020, 1025. 1075, 2010, 2061, 2085, 3035, 1035, 1036, 1044, 2036, 3036, 4036, 2035. 3090, 1030, 1040, 1041, 2005, 2060, 2090, 2099, 4035. Approved. See permit number T21CM00360.} | |
02/01/2022 | COT - LCBU - Roof Nailing | Passed | {Activity date: 02/01/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - 4090, 1005, 3005, 1020, 1025. 1075, 2010, 2061, 2085, 3035, 1035, 1036, 1044, 2036, 3036, 4036, 2035. 3090, 1030, 1040, 1041, 2005, 2060, 2090, 2099, 4035. Approved. See permit number T21CM00360.} | |
02/01/2022 | COT - LCBU - Building Progress | Passed | {Activity date: 02/01/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - 4090, 1005, 3005, 1020, 1025. 1075, 2010, 2061, 2085, 3035, 1035, 1036, 1044, 2036, 3036, 4036, 2035. 3090, 1030, 1040, 1041, 2005, 2060, 2090, 2099, 4035. Approved. See permit number T21CM00360.} ; {Activity date: 08/19/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Partial. Level #2 air shafts (2). Ok to fire caulk and cover.} | |
02/01/2022 | COT - LCPL - Plumbing Final | Passed | {Activity date: 02/01/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - 4090, 1005, 3005, 1020, 1025. 1075, 2010, 2061, 2085, 3035, 1035, 1036, 1044, 2036, 3036, 4036, 2035. 3090, 1030, 1040, 1041, 2005, 2060, 2090, 2099, 4035. Approved. See permit number T21CM00360.} ; {Activity date: 01/28/2022; Status: Partial Approval; Inspector: RSHERRY; Comment: Entered by RSHERRY1 - REVIEW OF WATER DISINFECTION REPORT COMPLETED} ; {Activity date: 02/18/2021; Status: Prior to Final Inspectn; Inspector: RSHERRY; Comment: Entered by RSHERRY1 - WATER DISINFECTION REPORT REQUIRED} | |
02/01/2022 | COT - LCEL - Grounding/Bonding | Passed | {Activity date: 02/01/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - 4090, 1005, 3005, 1020, 1025. 1075, 2010, 2061, 2085, 3035, 1035, 1036, 1044, 2036, 3036, 4036, 2035. 3090, 1030, 1040, 1041, 2005, 2060, 2090, 2099, 4035. Approved. See permit number T21CM00360.} | |
02/01/2022 | COT - LCBU - Masonry Pregrout | Passed | {Activity date: 02/01/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - 4090, 1005, 3005, 1020, 1025. 1075, 2010, 2061, 2085, 3035, 1035, 1036, 1044, 2036, 3036, 4036, 2035. 3090, 1030, 1040, 1041, 2005, 2060, 2090, 2099, 4035. Approved. See permit number T21CM00360.} ; {Activity date: 03/24/2021; Status: Cancelled; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Canceled by contractor.} ; {Activity date: 03/12/2021; Status: Partial Approval; Inspector: TTREMBULAK; Comment: Entered by VLEON1 - Partial. Stairwell one, third lift to 12 feet. Stairwell two, third lift to 20 feet. } ; {Activity date: 03/10/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VLEON1 - Partial. Stairwell one, second lift, 4 to8 feet. Stairwell two. Second lift, 4 to 12 feet with cleanouts.} |
|
02/04/2022 | ENGR Engineering Final | Passed | {Activity date: 02/04/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 02/03/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - OK FOR TCO FOR STOCKING ONLY} | |
02/07/2022 | COT - FCON - Fire - Final | Passed | {Activity date: 02/07/2022; Status: Approved; Inspector: MRoss; Comment: Entered by MROSS2 - } ; {Activity date: 01/31/2022; Status: Partial Approval; Inspector: MRoss; Comment: Entered by MROSS2 - -FA document box is installed -Installed FDC knox caps Walked site and went over required signage inside and fire lane signs outside.} ; {Activity date: 01/20/2022; Status: Partial Approval; Inspector: wmotto1; Comment: Entered by WMOTTO1 - 1. Ok for TCO to move equipment in only not to occupy. 2.prior to final need document box installed near alarm panel. 3. prior to final need sprinkler know caps on fdc.} |