Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Expired
Type:
Residential Building - One or Two Family
Address:
3201 E 30TH ST
Apply Date:
09/20/2020
Applicant:
Jerry Denney
Description:
INSTALLATION OF 8.64 KW PHOTOVOLTAIC SOLAR, MPUpgrade 200 AMP

Permit Reviews

Permit Number - T20CM06490
Permit Status: Expired
Permit Description: INSTALLATION OF 8.64 KW PHOTOVOLTAIC SOLAR, MPUpgrade 200 AMP
Start Date Submittal Complete Date Status  
09/20/2020 RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO 11/03/2020 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T20CM06490
Permit Status: Expired
Permit Description: INSTALLATION OF 8.64 KW PHOTOVOLTAIC SOLAR, MPUpgrade 200 AMP
Total Outstanding Activity Conditions - 2
Date Name
09/20/2020 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
09/20/2020 THE INSTALLATION SHALL COMPLY WITH ALL APPLICABLE REQUIREMENTS OF SECTION 605.11.1 THROUGH 605.11.4 OF THE 2012 EDITION OF THE INTERNATIONAL FIRE CODE, THE INTERNATIONAL BUILDING CODE AND NFPA 70.

Outstanding Inspections

Permit Status: Expired
Permit Number: T20CM06490
Permite Description: INSTALLATION OF 8.64 KW PHOTOVOLTAIC SOLAR, MPUpgrade 200 AMP
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
11/04/2022 RSBU - Building Final N/A Canceled Inspection Canceled

Completed Inspections

Permit Status: Expired
Permit Number: T20CM06490
Permit Description: INSTALLATION OF 8.64 KW PHOTOVOLTAIC SOLAR, MPUpgrade 200 AMP
Total Completed Inspections - 3
Date Description Inspector Results Comments
12/21/2020 COT - RSEL - Service Upgrade Passed {Activity date: 12/21/2020; Status: Approved; Inspector: TGAUSP; Comment: Entered by VLEON1 - approved grounding and bonding only.. recall for final.}
01/07/2021 PDSD Building Division - TEP PM Clearance Passed {Activity date: 01/07/2021; Status: Approved; Inspector: TGAUSP; Comment: Entered by VLEON1 - CODE DGC} ; {Activity date: 12/21/2020; Status: Approved; Inspector: RBOOHER; Comment: Entered by VLEON1 - CODE INCR}
01/07/2021 COT - RSEL - Electrical Final Passed {Activity date: 01/07/2021; Status: Approved; Inspector: TGAUSP; Comment: Entered by VLEON1 - Approved and ready to energize and solar meter}