Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Apply Date:
08/27/2020
Applicant:
James McMahon
Description:
SECOND DWELLING UNIT (PROJECT ALSO INCLUDES MAIN HOUSE, PATIO WALLS AND WALKWAYS, POOL AND CABANA UNDER SEPARATE PERMIT)

Permit Reviews

Permit Number - T20CM05558
Permit Status: Complete
Permit Description: SECOND DWELLING UNIT (PROJECT ALSO INCLUDES MAIN HOUSE, PATIO WALLS AND WALKWAYS, POOL AND CABANA UNDER SEPARATE PERMIT)
Start Date Submittal Complete Date Status  
03/15/2021 REVISION - - 1ST 03/23/2021 COMPLETED Review Details
07/27/2020 RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO 10/05/2020 COMPLETED Review Details
11/09/2020 RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO 12/09/2020 COMPLETED Review Details
12/17/2020 RESUBMITTAL 01/11/2021 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T20CM05558
Permit Status: Complete
Permit Description: SECOND DWELLING UNIT (PROJECT ALSO INCLUDES MAIN HOUSE, PATIO WALLS AND WALKWAYS, POOL AND CABANA UNDER SEPARATE PERMIT)
Total Outstanding Activity Conditions - 2
Date Name
03/22/2021 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
08/27/2020 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Outstanding Inspections

Permit Status: Complete
Permit Number: T20CM05558
Permite Description: SECOND DWELLING UNIT (PROJECT ALSO INCLUDES MAIN HOUSE, PATIO WALLS AND WALKWAYS, POOL AND CABANA UNDER SEPARATE PERMIT)
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
09/09/2022 COT - RSEL - Construction Power N/A Canceled {Activity date: 09/09/2022; Status: Not Applicable; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - NA}

Completed Inspections

Permit Status: Complete
Permit Number: T20CM05558
Permit Description: SECOND DWELLING UNIT (PROJECT ALSO INCLUDES MAIN HOUSE, PATIO WALLS AND WALKWAYS, POOL AND CABANA UNDER SEPARATE PERMIT)
Total Completed Inspections - 19
Date Description Inspector Results Comments
04/13/2021 COT - RSPL - Rough Soil Passed {Activity date: 04/13/2021; Status: Approved; Inspector: TTREMBULAK; Comment: Entered by VLEON1 - APPROVED OUT TO SEPTIC CONNECTION}
06/10/2021 COT - RSEL - Electrical Underground Passed {Activity date: 06/10/2021; Status: Approved; Inspector: TTREMBULAK; Comment: Entered by VLEON1 - }
10/06/2021 COT - RSBU - Roof Nailing Passed {Activity date: 10/06/2021; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - AP}
10/06/2021 COT - RSBU - Exterior Clips/Sheathing Passed {Activity date: 10/06/2021; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - AP}
11/24/2021 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed {Activity date: 11/24/2021; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by RSALDAT1 - Approved}
11/24/2021 COT - LCBU - Framing Passed {Activity date: 11/24/2021; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by RSALDAT1 - Approved} ; {Activity date: 10/06/2021; Status: Not ready for Inspection; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - NR}
11/24/2021 COT - LCPL - Plumbing Intermediate Passed {Activity date: 11/24/2021; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by RSALDAT1 - Approved}
11/24/2021 RSME - Mechanical Progress Passed {Activity date: 11/24/2021; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by RSALDAT1 - Approved}
12/23/2021 COT - RSPL - Yard Water Line Passed {Activity date: 12/23/2021; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 12/20/2021; Status: Cancelled; Inspector: RCHANDLER; Comment: Entered by VVERA1 - CA per text from contractor.

}
08/05/2022 COT - BULD - SWG Clearance Passed {Activity date: 08/05/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by VVERA1 - CODE}
08/05/2022 COT - RSPL - Gas Pressure Test Passed {Activity date: 08/05/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by VVERA1 - Approved. SWG clearance.

} ; {Activity date: 08/04/2022; Status: Not ready for Inspection; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - Not Ready.}
08/16/2022 COT - RSME - Mechanical Final Passed {Activity date: 08/16/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - Approved}
08/16/2022 COT - RSPL - Plumbing Final Passed {Activity date: 08/16/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - Approved}
09/09/2022 COT - RSEL - Grounding/Bonding Passed {Activity date: 09/09/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
09/09/2022 COT - RSBU - Preslab Passed {Activity date: 09/09/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 06/10/2021; Status: Partial Approval; Inspector: TTREMBULAK; Comment: Entered by VLEON1 - PARTIAL GUEST HOUSE SLAB APPROVE} ; {Activity date: 03/26/2021; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by VLEON1 - Partial approval for exterior wall u shaped stem walls on cabana building and guesthouse building (permit 05561) to framing exterior wall not including fence, post pads or adjoining mono pour patio or footers for framed exterior walls}
09/09/2022 RSBU - Building Final Passed {Activity date: 09/09/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 08/19/2022; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by VVERA1 - Partial Approval pending other inspections.

} ; {Activity date: 08/17/2022; Status: Cancelled; Inspector: RCHANDLER; Comment: Entered by VVERA1 - Canceled per phone call with contractor.} ; {Activity date: 08/16/2022; Status: Denied; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - -Denied: Obtain approval of all other inspections. Note: OK to store items, as long as access to inspection is not blocked.
}
09/09/2022 COT - RSEL - Outdoor Lighting Passed {Activity date: 09/09/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
09/09/2022 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 09/09/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 06/10/2021; Status: Partial Approval; Inspector: TTREMBULAK; Comment: Entered by VLEON1 - PARTIAL GUEST HOUSE SLAB APPROVED} ; {Activity date: 03/23/2021; Status: Partial Approval; Inspector: TTREMBULAK; Comment: Entered by RSALDAT1 - Partial. Guest house footings ok to pour.}
09/09/2022 COT - RSEL - Electrical Final Passed {Activity date: 09/09/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 08/16/2022; Status: Denied; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - Denied: Install smoke detector outside of bedrooms.}

Documents

File Name Document Type  
APPLICATION.PDF DOCUMENTS VIEW
CHECKLIST.PDF DOCUMENTS VIEW
DRAWINGS - REV.PDF DOCUMENTS VIEW
HVAC LOAD CALCULATIONS.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
OUTDOOR LIGHTING.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW
REVISION LETTER.PDF DOCUMENTS VIEW
SOIL REPORT.PDF DOCUMENTS VIEW
STRUCTURAL CALCS.PDF DOCUMENTS VIEW
T20CM05558 L OF C.PDF DOCUMENTS VIEW