Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Apply Date:
08/27/2020
Applicant:
James McMahon
Description:
SFR, PATIO WALLS AND WALKWAYS (PROJECT ALSO INCLUDES GUEST HOUSE, POOL AND CABANA)

Permit Reviews

Permit Number - T20CM05557
Permit Status: Issued
Permit Description: SFR, PATIO WALLS AND WALKWAYS (PROJECT ALSO INCLUDES GUEST HOUSE, POOL AND CABANA)
Start Date Submittal Complete Date Status  
03/15/2021 REVISION - - 1ST 03/23/2021 COMPLETED Review Details
07/27/2020 RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO 10/05/2020 COMPLETED Review Details
08/20/2021 OTHER 09/17/2021 COMPLETED Review Details
11/09/2020 RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO 12/09/2020 COMPLETED Review Details
12/09/2020 RESUBMITTAL 01/06/2021 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T20CM05557
Permit Status: Issued
Permit Description: SFR, PATIO WALLS AND WALKWAYS (PROJECT ALSO INCLUDES GUEST HOUSE, POOL AND CABANA)
Total Outstanding Activity Conditions - 2
Date Name
03/22/2021 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
08/27/2020 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Conditions

Permit Number - T20CM05557
Permit Status: Issued
Permit Description: SFR, PATIO WALLS AND WALKWAYS (PROJECT ALSO INCLUDES GUEST HOUSE, POOL AND CABANA)
Date Description Comments
08/31/2020 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)

Completed Inspections

Permit Status: Issued
Permit Number: T20CM05557
Permit Description: SFR, PATIO WALLS AND WALKWAYS (PROJECT ALSO INCLUDES GUEST HOUSE, POOL AND CABANA)
Total Completed Inspections - 23
Date Description Inspector Results Comments
02/22/2021 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 02/22/2021; Status: Approved; Inspector: KCOCO; Comment: Entered by VLEON1 - APPROVED} ; {Activity date: 02/19/2021; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - RI canceled}
02/23/2021 COT - RSEL - Grounding/Bonding Passed {Activity date: 02/23/2021; Status: Approved; Inspector: KCOCO; Comment: Entered by VLEON1 - APPROVED} ; {Activity date: 02/22/2021; Status: Not ready for Inspection; Inspector: KCOCO; Comment: Entered by VLEON1 - NOT READY} ; {Activity date: 02/19/2021; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - RI canceled}
03/25/2021 COT - RSPL - Rough Soil Passed {Activity date: 03/25/2021; Status: Approved; Inspector: TTREMBULAK; Comment: Entered by VLEON1 - APPROVED OUT TO SEPTIC TANK}
05/26/2021 COT - RSBU - Preslab Passed {Activity date: 05/26/2021; Status: Approved; Inspector: TTREMBULAK; Comment: Entered by VLEON1 - } ; {Activity date: 05/25/2021; Status: Partial Approval; Inspector: TTREMBULAK; Comment: Entered by VLEON1 - PARTIAL APPROVAL PENDING COMPLETION OF ELECTIRC (2010)} ; {Activity date: 03/01/2021; Status: Cancelled; Inspector: TTREMBULAK; Comment: Entered by VLEON1 - CANCELLED WILL RESCHEDULE}
05/26/2021 COT - RSEL - Electrical Underground Passed {Activity date: 05/26/2021; Status: Approved; Inspector: TTREMBULAK; Comment: Entered by VLEON1 - } ; {Activity date: 05/25/2021; Status: Cancelled; Inspector: TTREMBULAK; Comment: Entered by VLEON1 - CANCELLED WILL RESCHEDULE WHEN READY}
10/06/2021 COT - RSBU - Roof Nailing Passed {Activity date: 10/06/2021; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - AP}
10/06/2021 COT - RSBU - Exterior Clips/Sheathing Passed {Activity date: 10/06/2021; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - AP}
11/24/2021 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed {Activity date: 11/24/2021; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by RSALDAT1 - Approved}
11/24/2021 COT - LCPL - Plumbing Intermediate Passed {Activity date: 11/24/2021; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by RSALDAT1 - Approved}
11/24/2021 RSME - Mechanical Progress Passed {Activity date: 11/24/2021; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by RSALDAT1 - Approved}
12/23/2021 COT - RSPL - Yard Water Line Passed {Activity date: 12/23/2021; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 12/20/2021; Status: Cancelled; Inspector: RCHANDLER; Comment: Entered by VVERA1 - CA per text from contractor.

}
05/02/2022 PDSD Building Division - TEP PM Clearance Passed {Activity date: 05/02/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by VVERA1 - CODE ECO}
05/02/2022 COT - RSEL - Construction Power Passed {Activity date: 05/02/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by VVERA1 - AP. ECO clearance for TEP.

}
08/05/2022 COT - BULD - SWG Clearance Passed {Activity date: 08/05/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by VVERA1 - CODE}
08/05/2022 COT - RSPL - Gas Pressure Test Passed {Activity date: 08/05/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by VVERA1 - -Approved. SWG clearance.} ; {Activity date: 08/04/2022; Status: Not ready for Inspection; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - -Not Ready.} ; {Activity date: 07/13/2022; Status: Denied; Inspector: RCHANDLER; Comment: Entered by VVERA1 - -DE. Install permanent gas appliances per Code.}
08/16/2022 COT - RSPL - Plumbing Final Passed {Activity date: 08/16/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - Approved}
09/09/2022 COT - RSME - Mechanical Final Passed {Activity date: 09/09/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 08/16/2022; Status: Denied; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - -Denies: AC condenser is blocking emergency escape and rescue opening of North bedroom.

}
09/09/2022 COT - LCBU - Framing Passed {Activity date: 09/09/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 10/06/2021; Status: Not ready for Inspection; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - NR}
09/09/2022 COT - RSBU - Stem Wall/Retaining Wall Passed {Activity date: 09/09/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 03/01/2021; Status: Partial Approval; Inspector: TTREMBULAK; Comment: Entered by VLEON1 - PARTIAL ALL MAIN HOUSE WALLS OK}
09/09/2022 COT - RSEL - Outdoor Lighting Passed {Activity date: 09/09/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 09/09/2021; Status: Approved; Inspector: RCHANDLER; Comment: Entered by RSALDAT1 - -AP}
09/09/2022 COT - RSPL - Sewer Passed {Activity date: 09/09/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
09/28/2022 RSBU - Building Final Passed {Activity date: 09/28/2022; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by VVERA1 - APPROVED BY INSPECTOR AWAITING CONDITIONS
} ; {Activity date: 09/28/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by VVERA1 - AP} ; {Activity date: 09/09/2022; Status: Partial Approval; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - PA} ; {Activity date: 09/07/2022; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by VVERA1 - Partial Approval pending other inspections. Note: Built in barbecue eliminated per architect.} ; {Activity date: 09/07/2022; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by VVERA1 - Partial Approval pending other inspections.} ; {Activity date: 08/16/2022; Status: Denied; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - -Denied: 1-Obtain approval for all other inspections. 2-Provide installation instructions for built in barbecue to verify clearances to combustibles. Note: OK to store items that do not block access to inspection.}
09/28/2022 COT - RSEL - Electrical Final Passed {Activity date: 09/28/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by VVERA1 - AP} ; {Activity date: 09/09/2022; Status: Denied; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - DE. Expose ufer, install WR receptacles at all exterior locations} ; {Activity date: 08/16/2022; Status: Denied; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - Denied:Install Kitchen Counter receptacle on North end of Island.}

Documents

File Name Document Type  
10495 E TANQUE VERDE RD SEPTIC 2021-09-27 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
10495 E TANQUE VERDE RD SEPTIC PLAN 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
ARCHITECTURAL PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
CHECKLIST 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
DEVELOPMENT PACKAGE APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
GCL 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
HVAC LOAD CALCULATIONS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
OUTDOOR LIGHTING 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV1_ARCHITECTURAL PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV1_STRUCTURAL PLANS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV2_ARCHITECTURAL PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV2_JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV2_PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV2_TRUSS CALCS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV2_TRUSS LAYOUT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REVISED APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SITE GRADING PLAN 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SOIL REPORT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
STRUCTURAL CALCULATIONS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
STRUCTURAL PLANS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
10495 E TANQUE VERDE RD SEPTIC 2021-09-27.PDF DOCUMENTS VIEW
10495 E TANQUE VERDE RD SEPTIC PLAN.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
ARCHITECTURAL PLAN SET.PDF DOCUMENTS VIEW
CHECKLIST.PDF DOCUMENTS VIEW
DEVELOPMENT PACKAGE APPLICATION.PDF DOCUMENTS VIEW
GCL.PDF DOCUMENTS VIEW
HVAC LOAD CALCULATIONS.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
OUTDOOR LIGHTING.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
REV1_ARCHITECTURAL PLAN SET.PDF DOCUMENTS VIEW
REV1_STRUCTURAL PLANS.PDF DOCUMENTS VIEW
REV2_ARCHITECTURAL PLAN SET.PDF DOCUMENTS VIEW
REV2_JOB CARD.PDF DOCUMENTS VIEW
REV2_PERMIT.PDF DOCUMENTS VIEW
REV2_TRUSS CALCS.PDF DOCUMENTS VIEW
REV2_TRUSS LAYOUT.PDF DOCUMENTS VIEW
REVISED APPLICATION.PDF DOCUMENTS VIEW
SITE GRADING PLAN.PDF DOCUMENTS VIEW
SOIL REPORT.PDF DOCUMENTS VIEW
STRUCTURAL CALCULATIONS.PDF DOCUMENTS VIEW
STRUCTURAL PLANS.PDF DOCUMENTS VIEW
REVISION LETTER.PDF DOCUMENTS VIEW
ALTERNATIVE DETAIL 104.PDF CONSTRPLANS VIEW
DRAWINGS- REV.PDF CONSTRPLANS VIEW