Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Apply Date:
08/13/2020
Applicant:
Gary MORRELL
Description:
DUPLX DPM2248 T19-M0079

Permit Reviews

Permit Number - T20CM05285
Permit Status: Inspections complete
Permit Description: DUPLX DPM2248 T19-M0079
Start Date Submittal Complete Date Status  
07/27/2020 RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO 09/21/2020 COMPLETED Review Details
02/03/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/04/2025 APPROVED Review Details
01/28/2025 RESIDENTIAL NEW DWELLING REVISION v.1 01/28/2025 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - T20CM05285
Permit Status: Inspections complete
Permit Description: DUPLX DPM2248 T19-M0079
Date Description Comments
08/13/2020 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
08/13/2020 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
12/30/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: T20CM05285
Permite Description: DUPLX DPM2248 T19-M0079
Total Outstanding Inspections - 8
Last Inspection Date Description Inspector Results Comments
05/19/2022 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Not Ready {Activity date: 05/19/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by NGARCIA3 - Ap
Need 1025 and 1030 next. It is recommended that these 2 inspections be done, before installing plumbing and elec, in future builds. The risk is hitting wiring or plumbing in exterior walls with mesh staples, which would be seen at the intermediate inspections.}
08/25/2023 COT - RSEL - Construction Power N/A Not Applicable No inspection necessary
Previously inspected and electrical clearance sent 3/23...Duplex panel has been energized
12/21/2023 COT - RSEL - Electrical Final N/A Not Ready
12/21/2023 COT - RSEL - Outdoor Lighting N/A Not Ready
12/21/2023 COT - RSPL - Plumbing Final N/A Not Ready
12/21/2023 COT - RSPL - Sewer N/A Not Ready
12/21/2023 COT - RSME - Mechanical Final N/A Not Ready
12/21/2023 RSBU - Building Final N/A Not Ready

Completed Inspections

Permit Status: Inspections Complete
Permit Number: T20CM05285
Permit Description: DUPLX DPM2248 T19-M0079
Total Completed Inspections - 17
Date Description Inspector Results Comments
10/25/2021 COT - RSPL - Rough Soil Passed {Activity date: 10/25/2021; Status: Approved; Inspector: DQUINN; Comment: Entered by NGARCIA3 - Ap
All gray and black water roughs ok to backfill.}
11/02/2021 COT - RSEL - Grounding/Bonding Passed {Activity date: 11/02/2021; Status: Approved; Inspector: DQUINN; Comment: Entered by NGARCIA3 - Ap}
11/02/2021 COT - RSBU - Preslab Passed {Activity date: 11/02/2021; Status: Approved; Inspector: DQUINN; Comment: Entered by NGARCIA3 - Ap}
11/02/2021 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 11/02/2021; Status: Approved; Inspector: DQUINN; Comment: Entered by NGARCIA3 - Ap}
05/19/2022 COT - LCBU - Framing Passed {Activity date: 05/19/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by NGARCIA3 - Ap} ; {Activity date: 01/10/2022; Status: Cancelled; Inspector: DQUINN; Comment: Entered by NGARCIA3 - ca
Per Ruben
Need all 35s.

}
05/19/2022 COT - LCPL - Plumbing Intermediate Passed {Activity date: 05/19/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by NGARCIA3 - Ap} ; {Activity date: 05/17/2022; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - RI canceled}
06/01/2022 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed {Activity date: 06/01/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Approved} ; {Activity date: 05/27/2022; Status: Not ready for Inspection; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Not Ready
}
07/05/2022 COT - RSBU - Roof Nailing Passed {Activity date: 07/05/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 06/01/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Partial. Missing nails / fasteners on west side and south east corner.

} ; {Activity date: 05/27/2022; Status: Not ready for Inspection; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Not Ready

Onsite inspection conducted gates locked no access.}
12/09/2022 COT - RSBU - Firewall/Fire Barrier/Firestop Passed
03/20/2023 BULD - Electrical Clearance Passed Units A & B.
03/20/2023 COT - RSEL - Electrical Underground Passed Electric clearance for meter sets for 302 A &B.
01/08/2024 COT - RSEL - Electrical Final Passed
01/08/2024 COT - RSEL - Outdoor Lighting Passed
01/08/2024 COT - RSPL - Plumbing Final Passed
01/08/2024 COT - RSPL - Sewer Passed
01/08/2024 COT - RSME - Mechanical Final Passed
12/10/2024 RSBU - Building Final Passed Approved. 12/10/2024

Documents

File Name Document Type  
R69137673.212854_V2.PDF DOCUMENTS VIEW
OBA - ADDRESS RECEIPT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
OBA 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
OBA ADDRESS RECEIPT.PDF DOCUMENTS VIEW
OBA.PDF DOCUMENTS VIEW
OBA.PDF DOCUMENTS VIEW
B-SITE PLAN 302 E. YAVAPAI.PDF CONSTRPLANS VIEW
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
'PERMIT.PDF DOCUMENTS VIEW