Permit: T20CM05268
Permit Details
Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
1121 E BLANTON DR 1
Address NEW:
1121 E BLANTON DR 1
Apply Date:
08/13/2020
Applicant:
Luong Nguyen
Description:
NEW DUPLEX
Permit Reviews
Permit Number - T20CM05268
Permit Status: Inspections
Permit Description: NEW DUPLEX
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/24/2021 | RESUBMITTAL | 04/02/2021 | COMPLETED |
| 07/02/2021 | REVISION - - 1ST | 07/27/2021 | COMPLETED |
| 08/13/2020 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 10/07/2020 | COMPLETED |
| 02/20/2025 | RESIDENTIAL NEW DWELLING REVISION v.1 | 03/28/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - T20CM05268
Permit Status: Inspections
Permit Description: NEW DUPLEX
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 08/13/2020 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
| 09/16/2020 | FINAL ELEVATION CERTIFICATE REQUIRED: AN ORIGINAL FINAL ELEVATION CERTIFICATE SEALED BY A REGISTERED LAND SURVEYOR IS REQ'D. MAIL ELEVATION CERTIFICATE TO: CITY OF TUCSON, PLANNING & DEVELOPMENT SERVICES DEPT, ATTN: LOREN MAKUS, P.O. BOX 27210, TUCSON, AZ 85726-7210 OR DELIVER IT TO THE 1ST FL NORTH SIDE OF 201 N. STONE AVE. THIS CONDITION APPLIES TO ALL FINAL INSPECTIONS (1090, 2090, 3090, 4090) AND SHOULD NOT BE SCHEDULED UNTIL THE ELEVATION CERTIFICATE AND THE CONDITION HAVE BEEN APPROVED. LOREN'S IS 837-4927. |
Conditions
Permit Number - T20CM05268
Permit Status: Inspections
Permit Description: NEW DUPLEX
| Date | Description | Comments |
|---|---|---|
| 09/16/2020 | SPECIAL INSPECTION IS REQ'D FOR AN ELEVATION CERTIFICATE.THE ELEVATION OF THE FORMED PRE-SLAB MUST BE SUBMITTED ON AN ELEVATION CERTIFICATE AND SEALED BY A REGISTERED LAND SURVEYOR. FAX OR EMAIL ELEVATION CERTIFICATE TO: ATTENTION LOREN MAKUS. FAX: 879-8010, EMAIL: LOREN.MAKUS@TUCSONAZ.GOV. THIS CONDITION APPLIES TO INSPECTION 1015 AND SHOULD NOT BE SCHEDULED UNTIL THE ELEVATION CERTIFICATE AND THE CONDITION HAVE BEEN APPROVED. LOREN'S IS 837-4927. | |
| 02/11/2021 | FUP T20OT00641 MUST BE PAID BEFORE FINAL INSPECTIONS. | |
| 02/11/2021 | FUP T20OT00641 MUST BE PAID BEFORE FINAL INSPECTIONS. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: T20CM05268
Permite Description: NEW DUPLEX
Total Outstanding Inspections - 11
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | COT - RSME - Mechanical Final | N/A | Not Ready | |
| 10/27/2022 | RSBU - Building Final | N/A | Not Ready | |
| 10/27/2022 | COT - RSEL - Outdoor Lighting | N/A | Not Ready | |
| 10/26/2022 | COT - RSEL - Electrical Underground | N/A | Not Ready | |
| 10/27/2022 | COT - RSPL - Plumbing Final | N/A | Not Ready | |
| 10/27/2022 | COT - RSEL - Electrical Final | N/A | Not Ready | |
| 03/29/2023 | COT - RSPL - Rough Soil | N/A | Not Ready | |
| 10/26/2022 | COT - RSBU - Excavation/Rebar/Zoning | N/A | Not Ready | |
| 10/18/2024 | COT - RSEL - Construction Power | N/A | Not Applicable | |
| 04/11/2025 | RSME - Mechanical Progress | N/A | Partial Pass | plenums, flex, registers, and exhaust fans in place. okay to proceed progress areas. 4/11/2025 |
| 09/22/2026 | COT - RSBU - Firewall/Fire Barrier/Firestop | N/A | Partial Pass | 09/22/2026 Verified 5/8" gypsum to firewall. Partial pass pending putty pack at receptacles. |
Completed Inspections
Permit Status: Inspections
Permit Number: T20CM05268
Permit Description: NEW DUPLEX
Total Completed Inspections - 15
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/12/2021 | COT - RSPL - Sewer | Passed | {Activity date: 10/12/2021; Status: Approved; Inspector: DQUINN; Comment: Entered by VVERA1 - Ap New sewer tap for existing unit and old sewer tap for new unit.} ; {Activity date: 10/11/2021; Status: Cancelled; Inspector: DQUINN; Comment: Entered by NGARCIA3 - ca Per Luong} |
|
| 04/04/2023 | COT - RSPL - Rough Soil | Passed | ||
| 09/28/2023 | COT - RSBU - Preslab | Passed | 9/28/23: rebar per plan ok to pour. | |
| 09/28/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
| 09/28/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 9/28/23: rebar per plan ok to pour. | |
| 03/22/2024 | COT - RSPL - Yard Water Line | Passed | ||
| 04/26/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 04/26/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 04/26/2024 | COT - LCBU - Framing | Passed | ||
| 10/18/2024 | BULD - Electrical Clearance | Passed | ||
| 10/01/2025 | COT - BULD - SWG Clearance | Passed | Southwest gas clearance: SWG Unit 1 and 2 |
|
| 10/01/2025 | COT - RSPL - Gas Pressure Test | Passed | ||
| 03/27/2026 | RSME - Mechanical Progress | Passed | ||
| 09/22/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 09/22/2026 Added bracing to PEX lines, firefoamed penetrations, and loose Romex at panel. |
|
| 09/22/2026 | COT - LCPL - Plumbing Intermediate | Passed |