Permit: T20CM04784
Permit Details
Apply Date:
07/24/2020
Applicant:
TITAN SOLAR POWER ***APA***
Description:
INSTALLATION OF A 4.29 kW DC SYSTEM & REV1: MSP RATING REVISED TO 100/100A
Contractors:
- TITAN SOLAR POWER ***APA***
Permit Reviews
Permit Number - T20CM04784
Permit Status: Final
Permit Description: INSTALLATION OF A 4.29 kW DC SYSTEM & REV1: MSP RATING REVISED TO 100/100A
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/19/2020 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 10/02/2020 | COMPLETED |
| 10/19/2020 | REVISION - - 1ST | 11/16/2020 | COMPLETED |
Completed Inspections
Permit Status: Final
Permit Number: T20CM04784
Permit Description: INSTALLATION OF A 4.29 kW DC SYSTEM & REV1: MSP RATING REVISED TO 100/100A
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/01/2020 | TEP CLEARANCE - PM | TTREMBULAK | Approved | CODE DGC |
| 12/01/2020 | ELECTRIC - FINAL | TTREMBULAK | Approved | Clearance for TEP DGC connect (solar) ok. |
| 12/01/2020 | BUILDING - FINAL | TTREMBULAK | Approved | Clearance for TEP DGC connect (solar) ok. |