Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
C of o
Type:
COMMERCIAL ADDITION
Address NEW:
124 E BROADWAY BL
Apply Date:
07/21/2020
Applicant:
SCOTT BLANEY
Description:
Commercial Renovation and Addition

Permit Reviews

Permit Number - T20CM04583
Permit Status: C of o
Permit Description: Commercial Renovation and Addition
Start Date Submittal Complete Date Status  
07/21/2020 3RD PARTY REVIEW - COMMERCIAL 09/21/2020 COMPLETED Review Details
11/04/2020 RESUBMITTAL 11/23/2020 COMPLETED Review Details
12/14/2020 3RD PARTY REVIEW - REVISION/OTHER 01/29/2021 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T20CM04583
Permit Status: C of o
Permit Description: Commercial Renovation and Addition
Total Outstanding Activity Conditions - 1
Date Name
07/21/2020 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: C of o
Permit Number: T20CM04583
Permit Description: Commercial Renovation and Addition
Total Completed Inspections - 38
Date Description Inspector Results Comments
02/04/2021 ELECTRIC - UNDERGROUND JBURGE Approved APPROVED TWO 3 INCH CONDUITS FROM BUILDING TO TRANSFORMER, APPROXIMATELY 52 FEET, OK TO COVER PROGRESS AREA
03/12/2021 ELECTRIC - ABOVE CEILING JBURGE Approved Approved. Level #1 entry hallway. Lighting is in place. Ok to cover ceiling.
03/22/2021 TEP CLEARANCE - PM JBURGE Approved CODE ECO/ #201; 202; 203; 204; 205; 206; 207; 208; 209
03/30/2021 MECHANICAL - ABOVE CEILING JBURGE Approved Approved
03/30/2021 MECHANICAL - INTERMEDIATE JBURGE Approved Approved
03/30/2021 MECHANICAL - FINAL JBURGE Approved Approved. Air balance results forwarded to Robert Sherry.
03/31/2021 MECHANICAL - PROGRESS JBURGE Approved
03/31/2021 PLUMBING - PROGRESS JBURGE Approved
03/31/2021 SITE - SEWER JBURGE Approved
03/31/2021 PLUMBING - YARD WTR LINE/TEST JBURGE Approved
03/31/2021 PLUMBING - ABOVE CEILING JBURGE Approved
03/31/2021 PLUMBING - PRE SLAB JBURGE Approved
03/31/2021 PLUMBING - ROUGH, SOIL JBURGE Approved
03/31/2021 ELECTRIC - OUTDOOR LIGHTING JBURGE Approved
03/31/2021 ELECTRIC - PROGRESS JBURGE Approved
03/31/2021 ELECTRIC - INTERMEDIATE JBURGE Approved
03/31/2021 BUILDING - PROGRESS JBURGE Approved
03/31/2021 SHEET ROCK NAILING JBURGE Approved
03/31/2021 FIREWALL/FIREBARRIER/FIRESTOP JBURGE Approved
03/31/2021 BUILDING ABOVE CEILING JBURGE Approved
03/31/2021 FRAMING JBURGE Approved
03/31/2021 BUILDING PRE-SLAB JBURGE Approved
03/31/2021 PLUMBING - FINAL JBURGE Approved
03/31/2021 PLUMBING - INTERMEDIATE JBURGE Approved
03/31/2021 ELECTRIC - FINAL JBURGE Approved
03/31/2021 ELECTRIC - FINAL JBURGE Approved
03/31/2021 FIRE - ALARM FINAL wmotto Approved 1. Fire Alarm permit # is T21FC00006
03/31/2021 FIRE - FINAL wmotto Approved 1. Fire Alarm permit # is T21FC00006
03/31/2021 FIRE - FINAL wmotto Approved
03/31/2021 FIRE - ALARM FINAL wmotto Approved
03/31/2021 FIRE SPKLR - FINAL wmotto Approved
04/01/2021 OUTDOOR LIGHTING FINAL TGAUSP Approved
04/01/2021 BUILDING - FINAL TGAUSP Approved
04/01/2021 RIGHT OF WAY - FINAL AFlores Approved
05/12/2021 ENGINEERING - FINAL MHERNANDEZ Approved CN /THEY ARE GRADING AND FORMING FOR CURB .AND SUB-GRADE
02/25/2022 NPPO - FINAL DROBERTS Approved APPROVED
02/25/2022 SIGN - FINAL DROBERTS Approved APPROVED
02/25/2022 LANDSCAPE - FINAL DROBERTS Approved APPROVED

Documents

File Name Document Type  
T20CM04583 AIR BALANCE1.PDF DOCUMENTS VIEW
T20CM04583 WATER REPORT1.PDF DOCUMENTS VIEW
T20CM04953 AIR BALANCE1.PDF DOCUMENTS VIEW
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
CHECKLIST 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
FEE SHEETS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PLAN SET RESTAMPED 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PROJECT MANUAL 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REQUEST_TEMPORARY C OF O (6-17-2021) 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV1_PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SIC DOUBLE STAMPED 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SIC 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
STANTEC APPROVAL LETTER 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
STRUCTURAL CALCS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
T20CM04583 - COFO 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
TEMPORARY C OF O (4-02-2021) 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
TEMPORARY C OF O (6-17-2021) 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
CHECKLIST.PDF DOCUMENTS VIEW
FEE SHEETS.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLAN SET RESTAMPED.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW
PROJECT MANUAL.PDF DOCUMENTS VIEW
REQUEST_TEMPORARY C OF O (6-17-2021).PDF DOCUMENTS VIEW
REV1_PLAN SET.PDF DOCUMENTS VIEW
SIC DOUBLE STAMPED.PDF DOCUMENTS VIEW
SIC.PDF DOCUMENTS VIEW
STANTEC APPROVAL LETTER.PDF DOCUMENTS VIEW
STRUCTURAL CALCS.PDF DOCUMENTS VIEW
T20CM04583 - COFO.PDF DOCUMENTS VIEW
TEMPORARY C OF O (4-02-2021).PDF DOCUMENTS VIEW
TEMPORARY C OF O (6-17-2021).PDF DOCUMENTS VIEW
REVISION SUBMITTAL LETTER.PDF DOCUMENTS VIEW
REV_SPECS.PDF DOCUMENTS VIEW
REV_PLAN SET.PDF CONSTRPLANS VIEW