Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Final
Type:
SOLAR WAIVER - RES
Apply Date:
07/21/2020
Applicant:
TITAN SOLAR POWER ***APA***
Description:
INSTALLATION OF A 12.96 KW DC SYSTEM; MAIN BREAKER DERATE TO 175A
Contractors:
  • TITAN SOLAR POWER ***APA***

Permit Reviews

Permit Number - T20CM04566
Permit Status: Final
Permit Description: INSTALLATION OF A 12.96 KW DC SYSTEM; MAIN BREAKER DERATE TO 175A
Start Date Submittal Complete Date Status  
07/21/2020 RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO 08/14/2020 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T20CM04566
Permit Status: Final
Permit Description: INSTALLATION OF A 12.96 KW DC SYSTEM; MAIN BREAKER DERATE TO 175A
Total Outstanding Activity Conditions - 2
Date Name
07/21/2020 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
07/21/2020 THE INSTALLATION SHALL COMPLY WITH ALL APPLICABLE REQUIREMENTS OF SECTION 605.11.1 THROUGH 605.11.4 OF THE 2012 EDITION OF THE INTERNATIONAL FIRE CODE, THE INTERNATIONAL BUILDING CODE AND NFPA 70.

Completed Inspections

Permit Status: Final
Permit Number: T20CM04566
Permit Description: INSTALLATION OF A 12.96 KW DC SYSTEM; MAIN BREAKER DERATE TO 175A
Total Completed Inspections - 3
Date Description Inspector Results Comments
10/28/2020 ELECTRIC - FINAL TTREMBULAK Approved Approved. Clearance for TEP DGC connect (solar) ok.
10/28/2020 TEP CLEARANCE - PM TTREMBULAK Approved CODE DGC
10/28/2020 BUILDING - FINAL TTREMBULAK Approved Approved