Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
06/24/2020
Applicant:
Albert LeCocq
Description:
NEW APARTMENT BLDG

Permit Reviews

Permit Number - T20CM03956
Permit Status: Complete
Permit Description: NEW APARTMENT BLDG
Start Date Submittal Complete Date Status  
07/01/2020 PLANS OK TO SUBMIT - COMM 07/08/2020 COMPLETED Review Details
07/08/2020 3RD PARTY REVIEW - COMMERCIAL 09/30/2020 COMPLETED Review Details
12/01/2020 3RD PARTY REVIEW - REVISION/OTHER 03/01/2021 COMPLETED Review Details
06/13/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/17/2024 APPROVED Review Details

Conditions

Permit Number - T20CM03956
Permit Status: Complete
Permit Description: NEW APARTMENT BLDG
Date Description Comments
03/15/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
03/15/2024 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
03/15/2024 Plan review applications expire 180 days from date of submittal unless the permit has been issued. Permits expire 180 days after issuance or last approved inspection.
03/15/2024 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
03/15/2024 SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED.
03/15/2024 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: T20CM03956
Permite Description: NEW APARTMENT BLDG
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
11/04/2022 PDSD Site/Engineering Division - Landscaping N/A Canceled Inspection Canceled
11/04/2022 COT - FCON - Alarm - Final N/A Canceled Inspection Canceled
11/04/2022 COT - FCON - Sprinkler - Final N/A Canceled Inspection Canceled

Completed Inspections

Permit Status: Complete
Permit Number: T20CM03956
Permit Description: NEW APARTMENT BLDG
Total Completed Inspections - 21
Date Description Inspector Results Comments
03/10/2021 COT - LCBU - Excavation/Rebar/Zoning Passed {Activity date: 03/10/2021; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VLEON1 - Approved. From the outside of building to the main 6 inch private sewer.
}
03/10/2021 COT - LCEL - Temporary Service Passed {Activity date: 03/10/2021; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VLEON1 - Approved. Meters for the following units. 61 through 76 plus the house meter.}
03/10/2021 COT - LCPL - Yard Water Line Passed {Activity date: 03/10/2021; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VLEON1 - Approved. Portable water for unit 61 through 67.}
04/12/2021 PDSD Building Division - TEP PM Clearance Passed {Activity date: 04/12/2021; Status: Approved; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - CODE TMPP/UNITS 61-76 AND HOUSE METER}
07/02/2021 COT - LCBU - Framing Passed {Activity date: 07/02/2021; Status: Approved; Inspector: RELEFANTE; Comment: Entered by VLEON1 - }
07/02/2021 COT - LCBU - Roof Nailing Passed {Activity date: 07/02/2021; Status: Approved; Inspector: RELEFANTE; Comment: Entered by VLEON1 - }
10/14/2021 COT - LCBU - Building Final Passed {Activity date: 10/14/2021; Status: Approved; Inspector: TGAUSP; Comment: Entered by RSALDAT1 - Approved, Building #5, units 61-76}
10/14/2021 COT - LCEL - Electrical Intermediate Passed {Activity date: 10/14/2021; Status: Approved; Inspector: TGAUSP; Comment: Entered by RSALDAT1 - } ; {Activity date: 10/11/2021; Status: Cancelled; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - cancelled by Contractor, will reschedule}
10/14/2021 COT - LCME - Mechanical Final Passed {Activity date: 10/14/2021; Status: Approved; Inspector: TGAUSP; Comment: Entered by RSALDAT1 - Approved}
10/14/2021 COT - LCEL - Outdoor Lighting Passed {Activity date: 10/14/2021; Status: Approved; Inspector: TGAUSP; Comment: Entered by RSALDAT1 - Approved}
10/14/2021 COT - LCPL - Plumbing Intermediate Passed {Activity date: 10/14/2021; Status: Approved; Inspector: TGAUSP; Comment: Entered by RSALDAT1 - } ; {Activity date: 10/11/2021; Status: Cancelled; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - cancelled by Contractor, will reschedule}
10/14/2021 COT - LCEL - Electrical Final Passed {Activity date: 10/14/2021; Status: Approved; Inspector: TGAUSP; Comment: Entered by RSALDAT1 - }
10/14/2021 COT - LCPL - Rough Soil Passed {Activity date: 10/14/2021; Status: Approved; Inspector: TGAUSP; Comment: Entered by RSALDAT1 - }
10/14/2021 COT - LCME - Mechanical Intermediate Passed {Activity date: 10/14/2021; Status: Approved; Inspector: TGAUSP; Comment: Entered by RSALDAT1 - } ; {Activity date: 10/11/2021; Status: Cancelled; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - cancelled by Contractor, will reschedule}
10/14/2021 COT - LCPL - Plumbing Final Passed {Activity date: 10/14/2021; Status: Approved; Inspector: TGAUSP; Comment: Entered by RSALDAT1 - Approved}
10/14/2021 COT - LCEL - Grounding/Bonding Passed {Activity date: 10/14/2021; Status: Approved; Inspector: TGAUSP; Comment: Entered by RSALDAT1 - } ; {Activity date: 10/12/2021; Status: Not ready for Inspection; Inspector: TGAUSP; Comment: Entered by RSALDAT1 - NR, pending Electrical Final

02/05/2021 1035 TGAUSP FRAMING Approved is Approved
02/05/2021 2035 TGAUSP ELECTRIC - INTERMEDIATE Approved is Approved
02/03/2021 3035 TGAUSP PLUMBING - INTERMEDIATE Approved 1st floor apartments #5, #6, #7, #8 are Approved
Water and DWV not on test in 2nd floor apartments #9, #10, #11, #12, #13, #14, #15, #16 Not Ready (NR)
2/3/2021 4035 MECHANICAL - INTERMEDIATE TGAUSP Partial Approval
3/10/2021 3057 SITE - SEWER ESTEVENS Cancelled}
12/07/2023 TRSP - ROW - Final/Close-Out Passed
12/06/2023 ENGR Engineering Final Passed
12/06/2023 COT - FCON - Fire - Final Passed
12/06/2023 COT - BULD - SWG Clearance Passed No clearance required.
12/06/2023 BULD - Electrical Clearance Passed No clearance required

Documents

File Name Document Type  
HVAC LOAD CALCS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
RESCHECK 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV1_PLAN SET STANTEC APPROVED 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV1_PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SIC 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
STANTEC APPROVED STRUCTURAL CALCS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
STRUCTURAL CALCS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
SCAN_MAREVAL1_2024-06-12-11-39-32-2024-06-12_V1.PDF DOCUMENTS VIEW
HVAC LOAD CALCS.PDF DOCUMENTS VIEW
RESCHECK.PDF DOCUMENTS VIEW
REV1_PLAN SET STANTEC APPROVED.PDF DOCUMENTS VIEW
REV1_PLAN SET.PDF DOCUMENTS VIEW
SIC.PDF DOCUMENTS VIEW
STANTEC APPROVED STRUCTURAL CALCS.PDF DOCUMENTS VIEW
STRUCTURAL CALCS.PDF DOCUMENTS VIEW
CHECKLIST DOCUMENTS VIEW
COMPLIANCE CERT DOCUMENTS VIEW
FEE SHEETS DOCUMENTS VIEW
APPLICATION DOCUMENTS VIEW
APPROVAL LETTER DOCUMENTS VIEW
JOB CARD DOCUMENTS VIEW
LETTER DOCUMENTS VIEW
PERMIT DOCUMENTS VIEW
HVAC LOAD CALCS DOCUMENTS VIEW
SPECIAL INSPECTION CERT DOCUMENTS VIEW
STRUCTURAL CALCS DOCUMENTS VIEW
WASTEWATER DOCUMENTS VIEW
SIGNED PSA DOCUMENTS VIEW
PLAN SET CONSTRPLANS VIEW