Permit Details

Status:
Final
Type:
SINGLE FAMILY NEW
Apply Date:
06/11/2020
Applicant:
D R H TUCSON CONSTRUCTION
Description:
SFR DRHOH35B19 T19-M0140
Contractors:
  • D R H TUCSON CONSTRUCTION

Permit Reviews

Permit Number - T20CM03581
Permit Status: Final
Permit Description: SFR DRHOH35B19 T19-M0140
Start Date Submittal Complete Date Status  
06/11/2020 RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO 06/11/2020 ACTIVE Review Details

Completed Inspections

Permit Status: Final
Permit Number: T20CM03581
Permit Description: SFR DRHOH35B19 T19-M0140
Total Completed Inspections - 22
Date Description Inspector Results Comments
06/25/2020 PLUMBING - SEWER HCS CONNECT ESTEVENS Approved All three are approved.
06/25/2020 PLUMBING - YARD WTR LINE/TEST ESTEVENS Approved All three are approved.
06/25/2020 PLUMBING - ROUGH, SOIL ESTEVENS Approved All three are approved.
07/09/2020 TEP CLEARANCE - PM ESTEVENS Approved CODE ECO
07/09/2020 ELECTRIC - CONSTRUCTION POWER ESTEVENS Approved All five are approved. The TEP clearance code is ECO.
07/09/2020 ELECTRIC - UNDERGROUND ESTEVENS Approved All five are approved. The TEP clearance code is ECO.
07/09/2020 ELECTRIC - UFER ESTEVENS Approved All five are approved. The TEP clearance code is ECO.
07/09/2020 BUILDING PRE-SLAB ESTEVENS Approved All five are approved. The TEP clearance code is ECO.
07/09/2020 EXCAVATION/LAYOUT REBAR & ZON ESTEVENS Approved All five are approved. The TEP clearance code is ECO.
07/24/2020 ROOF NAILING ESTEVENS Approved Both are approved.
07/24/2020 EXT METAL CLIPS/EXT SHEATHING ESTEVENS Approved Both are approved.
08/11/2020 FRAMING ESTEVENS Approved Southwest gas clearance is required. All five are approved.
08/11/2020 RESIDENTIAL INTERMEDIATE ESTEVENS Approved Southwest gas clearance is required. All five are approved.
08/11/2020 PLUMBING - INTERMEDIATE ESTEVENS Approved Southwest gas clearance is required. All five are approved.
08/11/2020 MECHANICAL - INTERMEDIATE ESTEVENS Approved Southwest gas clearance is required. All five are approved.
08/11/2020 PLUMBING - GAS PRESSURE TEST ESTEVENS Approved Southwest gas clearance is required. All five are approved.
10/13/2020 MECHANICAL - FINAL DQUINN Approved
10/13/2020 PLUMBING - FINAL DQUINN Approved
10/13/2020 OUTDOOR LIGHTING FINAL DQUINN Approved
10/13/2020 ELECTRIC - FINAL DQUINN Approved
10/13/2020 BUILDING - FINAL DQUINN Approved
10/15/2020 GAS CLEARANCE ESTEVENS Approved CODE

Documents

File Name Document Type  
HERS FORM.PDF DOCUMENTS VIEW
INSULATION CERT.PDF DOCUMENTS VIEW
SIC DOUBLE STAMPED.PDF DOCUMENTS VIEW