Permit Details

Status:
Fees Due
Type:
Commercial Building
Apply Date:
06/04/2020
Applicant:
David Garcia
Description:
NEW SHELL BLDG

Permit Reviews

Permit Number - T20CM03407
Permit Status: Fees due
Permit Description: NEW SHELL BLDG
Start Date Submittal Complete Date Status  
06/04/2020 PLANS OK TO SUBMIT - COMM 06/17/2020 COMPLETED Review Details
06/17/2020 COMMERCIAL - NEW 09/03/2020 COMPLETED Review Details
08/14/2020 RESUBMITTAL 08/28/2020 COMPLETED Review Details
08/28/2020 RESUBMITTAL 09/03/2020 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T20CM03407
Permit Status: Fees due
Permit Description: NEW SHELL BLDG
Total Outstanding Activity Conditions - 12
Date Name
06/04/2020 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
07/16/2020 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
07/16/2020 SPECIAL INSPECTION FORMS AND REPORTS REQUIRED PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY.
07/16/2020 SPECIAL INSPECTION FOR CONCRETE IS REQUIRED..
07/16/2020 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
07/16/2020 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.
07/16/2020 SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED.
07/16/2020 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED.
07/16/2020 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
07/16/2020 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
07/16/2020 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
07/16/2020 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.

Outstanding Inspections

Permit Status: Fees Due
Permit Number: T20CM03407
Permite Description: NEW SHELL BLDG
Total Outstanding Inspections - 32
Last Inspection Date Description Inspector Results Comments
10/26/2022 COT - LCBU - Building Above Ceiling N/A Not Ready
10/26/2022 COT - LCBU - Stem Wall/Retaining Wall N/A Not Ready
10/27/2022 COT - LCBU - Building Final N/A Not Ready
10/26/2022 COT - LCEL - Electrical Intermediate N/A Not Ready
10/27/2022 COT - LCBU - Framing N/A Not Ready
10/26/2022 COT - LCME - Mechanical Final N/A Not Ready
10/26/2022 COT - LCBU - Excavation/Rebar/Zoning N/A Not Ready
10/26/2022 COT - LCBU - Firewall/Fire Barrier/Firestop N/A Not Ready
10/26/2022 COT - FCON - Underground Flush N/A Not Ready
10/26/2022 COT - LCPL - Plumbing Roof Drains N/A Not Ready
10/26/2022 COT - LCEL - Outdoor Lighting N/A Not Ready
10/26/2022 COT - LCBU - Preslab N/A Not Ready
10/27/2022 COT - LCPL - Plumbing Intermediate N/A Not Ready
10/26/2022 COT - FCON - Alarm - Final N/A Not Ready
10/27/2022 COT - LCEL - Electrical Final N/A Not Ready
10/27/2022 ENGR Engineering Final N/A Not Ready
10/26/2022 COT - FCON - Sprinkler - Final N/A Not Ready
10/26/2022 COT - HCBU - Exterior Clips/Sheathing N/A Not Ready
10/26/2022 COT - LCBU - Exterior Clips/Sheathing N/A Not Ready
10/26/2022 COT - LCBU - Sustainability N/A Not Ready
10/26/2022 COT - LCPL - Rough Soil N/A Not Ready
10/26/2022 COT - FCON - Fire - Final N/A Not Ready
10/26/2022 COT - LCEL - Electrical Above Ceiling N/A Not Ready
10/26/2022 COT - LCME - Mechanical Intermediate N/A Not Ready
10/26/2022 COT - LCBU - Roof Nailing N/A Not Ready
10/26/2022 FCON – OH Piping & Hydro N/A Not Ready
10/26/2022 COT - LCBU - Building Progress N/A Not Ready
10/26/2022 COT - LCPL - Yard Water Line N/A Not Ready
10/26/2022 COT - LCPL - Sewer N/A Not Ready
10/26/2022 COT - FCON - Underground Pressure N/A Not Ready
10/26/2022 COT - LCPL - Plumbing Final N/A Not Ready
10/26/2022 COT - LCBU - Masonry Pregrout N/A Not Ready

Documents

File Name Document Type  
1_COMM CHECKLIST.PDF DOCUMENTS VIEW
1_PERMIT APP.PDF DOCUMENTS VIEW
1_SPECIAL_INSPECTION_CERTIFICATE.PDF DOCUMENTS VIEW
1_STRUCTURAL CALCULATIONS.PDF DOCUMENTS VIEW
2_GEOTECHNICAL REPORT (1).PDF DOCUMENTS VIEW
2_MECH CHECK (2).PDF DOCUMENTS VIEW
2_SYSTEMS DESIGN REPORT (1).PDF DOCUMENTS VIEW
3_PLAN SET (10).PDF DOCUMENTS VIEW