Permit: T20CM03318
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
2121 E 2ND ST
Address NEW:
2121 E 2ND ST
Apply Date:
06/01/2020
Applicant:
Description:
ADDITION: 2 BEDRM AND 2 BATH
Permit Reviews
Permit Number - T20CM03318
Permit Status: Complete
Permit Description: ADDITION: 2 BEDRM AND 2 BATH
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/01/2020 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 07/30/2020 | COMPLETED |
| 07/30/2020 | RESUBMITTAL | 07/31/2020 | COMPLETED |
Conditions
Permit Number - T20CM03318
Permit Status: Complete
Permit Description: ADDITION: 2 BEDRM AND 2 BATH
| Date | Description | Comments |
|---|---|---|
| 06/01/2020 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T20CM03318
Permite Description: ADDITION: 2 BEDRM AND 2 BATH
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/04/2022 | COT - RSEL - Grounding/Bonding | N/A | Canceled | Inspection Canceled |
| 11/04/2022 | COT - RSEL - Construction Power | N/A | Canceled | Inspection Canceled |
| 09/04/2025 | COT - RSEL - Electrical Underground | N/A | Not Applicable | N/A |
| 09/04/2025 | COT - RSPL - Yard Water Line | N/A | Not Applicable | |
| 09/04/2025 | RSBU - Building Final | N/A | Re-inspection required | 1. All exterior receptacles need to be GFCI protected and WR rated. 2. Loose receptacle just outside the patio on the right.. 3. loose receptacles throughout mainly in the laundry. 4. smoke detectors will need to be tested and interconnected. 5. carbon monoxide detectors needed outside all immediate sleeping areas. 6. Will need a ladder to get on the roof and check the HVAC. 7. No power in powder room receptacle. |
Completed Inspections
Permit Status: Complete
Permit Number: T20CM03318
Permit Description: ADDITION: 2 BEDRM AND 2 BATH
Total Completed Inspections - 18
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/17/2020 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 08/17/2020; Status: Approved; Inspector: TTREMBULAK; Comment: Entered by JSCHNEI2 - Approved} | |
| 09/16/2020 | COT - RSBU - Stem Wall/Retaining Wall | Passed | {Activity date: 09/16/2020; Status: Approved; Inspector: DQUINN; Comment: Entered by JSCHNEI2 - Ap} | |
| 09/16/2020 | COT - RSPL - Rough Soil | Passed | {Activity date: 09/16/2020; Status: Approved; Inspector: DQUINN; Comment: Entered by JSCHNEI2 - Ap} | |
| 10/14/2020 | COT - RSEL - Service Relocation | Passed | {Activity date: 10/14/2020; Status: Approved; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Approved. The TEP clearance code INCR. Relocate existing panel.} | |
| 10/14/2020 | PDSD Building Division - TEP PM Clearance | Passed | {Activity date: 10/14/2020; Status: Approved; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - CODE INCR} | |
| 11/20/2020 | COT - RSBU - Roof Nailing | Passed | {Activity date: 11/20/2020; Status: Approved; Inspector: DQUINN; Comment: Entered by PAHUMAD1 - } | |
| 11/20/2020 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | {Activity date: 11/20/2020; Status: Approved; Inspector: DQUINN; Comment: Entered by PAHUMAD1 - } | |
| 11/20/2020 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | {Activity date: 11/20/2020; Status: Approved; Inspector: DQUINN; Comment: Entered by PAHUMAD1 - } | |
| 11/20/2020 | RSME - Mechanical Progress | Passed | {Activity date: 11/20/2020; Status: Approved; Inspector: DQUINN; Comment: Entered by PAHUMAD1 - } | |
| 11/23/2020 | COT - LCPL - Plumbing Intermediate | Passed | {Activity date: 11/23/2020; Status: Approved; Inspector: ESTEVENS; Comment: Entered by PAHUMAD1 - Both are approved. Southwest gas clearance is required.} ; {Activity date: 11/20/2020; Status: Not ready for Inspection; Inspector: DQUINN; Comment: Entered by PAHUMAD1 - } | |
| 11/23/2020 | COT - BULD - SWG Clearance | Passed | {Activity date: 11/23/2020; Status: Approved; Inspector: ESTEVENS; Comment: Entered by PAHUMAD1 - CODE} | |
| 11/23/2020 | COT - RSPL - Gas Pressure Test | Passed | {Activity date: 11/23/2020; Status: Approved; Inspector: ESTEVENS; Comment: Entered by PAHUMAD1 - Both are approved. Southwest gas clearance is required.} | |
| 02/01/2021 | COT - LCBU - Framing | Passed | {Activity date: 02/01/2021; Status: Approved; Inspector: TGAUSP; Comment: Entered by VLEON1 - APPROVED OK TO ROCK} ; {Activity date: 11/20/2020; Status: Partial Approval; Inspector: DQUINN; Comment: Entered by PAHUMAD1 - Need fireplace installed.} | |
| 07/30/2025 | COT - RSEL - Outdoor Lighting | Passed | 7.30.25 | |
| 09/04/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 09/08/2025 | COT - RSME - Mechanical Final | Passed | ||
| 09/08/2025 | COT - RSEL - Electrical Final | Passed | ||
| 09/08/2025 | RSBU - Building Final | Passed |