Permit: T20CM00441
Permit Details
Apply Date:
01/21/2020
Applicant:
MATTAMY ARIZONA CONSTRUCTION L L C ** APA **
Description:
SFR F60A19 T19-M0029
Contractors:
- MATTAMY ARIZONA CONSTRUCTION L L C ** APA **
Permit Reviews
Permit Number - T20CM00441
Permit Status: Final
Permit Description: SFR F60A19 T19-M0029
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/21/2020 | RESIDENTIAL - BLDG/ZONING-WALKTHRU | 01/21/2020 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T20CM00441
Permit Status: Final
Permit Description: SFR F60A19 T19-M0029
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
01/21/2020 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T20CM00441
Permit Description: SFR F60A19 T19-M0029
Total Completed Inspections - 23
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/03/2020 | PLUMBING - SEWER HCS CONNECT | BSTEVENS | Approved | RVI |
02/03/2020 | PLUMBING - YARD WTR LINE/TEST | BSTEVENS | Approved | RVI |
02/03/2020 | PLUMBING - ROUGH, SOIL | BSTEVENS | Approved | RVI |
02/07/2020 | ELECTRIC - UFER | BSTEVENS | Approved | RVI |
02/07/2020 | BUILDING PRE-SLAB | BSTEVENS | Approved | RVI |
02/07/2020 | EXCAVATION/LAYOUT REBAR & ZON | BSTEVENS | Approved | RVI |
02/26/2020 | ROOF NAILING | MRAMBER | Approved | |
02/26/2020 | EXT METAL CLIPS/EXT SHEATHING | MRAMBER | Approved | |
03/11/2020 | MECHANICAL - INTERMEDIATE | BSTEVENS | Approved | |
03/11/2020 | RESIDENTIAL INTERMEDIATE | BSTEVENS | Approved | |
03/11/2020 | RESIDENTIAL INTERMEDIATE | MRAMBER | Approved | Plumbing domestic and DWV not on test |
03/11/2020 | MECHANICAL - INTERMEDIATE | MRAMBER | Approved | Secondary drain not properly installed, provide minimum 8th inch per foot drop. |
03/11/2020 | TEP CLEARANCE - PM | MRAMBER | Approved | CODE ECO |
03/11/2020 | ELECTRIC - CONSTRUCTION POWER | MRAMBER | Approved | ECO OK to clear. |
03/11/2020 | PLUMBING - GAS PRESSURE TEST | MRAMBER | Approved | |
03/11/2020 | ELECTRIC - UNDERGROUND | MRAMBER | Approved | |
03/11/2020 | FRAMING | BSTEVENS | Approved | RVI THIS WAS A REINSPECT OF INTERMEDIATE INSPECTION DONE THIS MORNING BY MRAMBER. |
04/02/2020 | SHEET ROCK NAILING | DMUNIZ | Approved | |
05/18/2020 | MECHANICAL - FINAL | WGALLAGHER | Approved | |
05/18/2020 | PLUMBING - FINAL | WGALLAGHER | Approved | |
05/18/2020 | OUTDOOR LIGHTING FINAL | WGALLAGHER | Approved | |
05/21/2020 | ELECTRIC - FINAL | WGALLAGHER | Approved | |
05/21/2020 | BUILDING - FINAL | WGALLAGHER | Approved |