Permit: T19RW07710
Permit Details
Apply Date:
12/24/2019
Applicant:
TUCSON ELECTRIC POWER **B
Description:
INSTALL 9,450' OF OVERHEAD WIRE AND 19 POLES (DIG 2-3.5' HOLES, 10-4' HOLES, 5-5' HOLES & 2-6' HOLES IN DIRT). NOTES: BUS STOP IN AREA, YOU WILL HAVE TO NOTIFY SUNTRAN 24 HOURS PRIOR TO WORK SUN TRAN CONTACTS: BEA PAULUS 520-206-8826 CHRISTINA ROCK 520-206-8934 Road was restored by the "Prop 409 Residential Streets", any new asphalt that is disturbed will require a 2" mill and overlay for 50' in each direction from the outside of the cut for all effected travel lanes.
Completed Inspections
Permit Status: Final
Permit Number: T19RW07710
Permit Description: INSTALL 9,450' OF OVERHEAD WIRE AND 19 POLES (DIG 2-3.5' HOLES, 10-4' HOLES, 5-5' HOLES & 2-6' HOLES IN DIRT).
NOTES:
BUS STOP IN AREA, YOU WILL HAVE TO NOTIFY SUNTRAN 24 HOURS PRIOR TO WORK SUN TRAN CONTACTS:
BEA PAULUS 520-206-8826 CHRISTINA ROCK 520-206-8934
Road was restored by the "Prop 409 Residential Streets", any new asphalt that is disturbed will require a 2" mill and overlay for 50' in each direction from the outside of the cut for all effected travel lanes.
Total Completed Inspections - 1
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/13/2020 | TDOT-EXCAV GENERAL INSPECTION | Bravin | Approved | all 19 poles and overhead wire has been installed. Throughout project TEP inspector was on site, all concrete for pole foundations were tested and accepted prior to standing poles. All wire installed for overhead. No repairs needed and no issues Project was helped along due to less traffic on roadway. |