Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Final
Type:
Barricade and Excavation
Address:
128 S HERBERT AV
Address NEW:
128 S HERBERT AV
Apply Date:
12/23/2019
Applicant:
TUCSON ELECTRIC POWER **B
Description:
REMOVING 2 POLES; REPLACING 3 POLES; ANCHORS; RE-CONDUCTORING HERBERT AVE FROM BROADWAY TO 12TH ST. 01/31/20 - OTHER ACTIVITIES IN THE AREA, WILL NEED TO COORDINATE TRAFFIC CONTROL SETUP WITH EXISTING SETUP. 03/25/20 - INSTALLING ONE ADDITIONAL POLE ON WO 6309569

Completed Inspections

Permit Status: Final
Permit Number: T19RW07677
Permit Description: REMOVING 2 POLES; REPLACING 3 POLES; ANCHORS; RE-CONDUCTORING HERBERT AVE FROM BROADWAY TO 12TH ST. 01/31/20 - OTHER ACTIVITIES IN THE AREA, WILL NEED TO COORDINATE TRAFFIC CONTROL SETUP WITH EXISTING SETUP. 03/25/20 - INSTALLING ONE ADDITIONAL POLE ON WO 6309569
Total Completed Inspections - 1
Date Description Inspector Results Comments
08/07/2020 TDOT-EXCAV GENERAL INSPECTION Bravin Approved all pole work has been completed on Herbert. Electric work is for new high rise apartments. Herbert will be repaved upon completion of building. No issues