Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
Barricade and Excavation
Address:
7421 E 38TH ST
Address NEW:
7421 E 38TH ST
Apply Date:
12/18/2019
Applicant:
SOUTHWEST GAS
Description:
(2) 5X5 bellholes in dirt alley -- to repair/replace gas line COYL project--NPL crews NOTES: Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvements and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced. Road was restored by the "Prop 409 Residential Streets", any new asphalt that is disturbed will require a 2" mill and overlay for 50' in each direction from the outside of the cut for all effected travel lanes.
Contractors:
  • NATIONAL BARRICADE LLC

Completed Inspections

Permit Status: Final
Permit Number: T19RW07607
Permit Description: (2) 5X5 bellholes in dirt alley -- to repair/replace gas line COYL project--NPL crews NOTES: Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvements and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced. Road was restored by the "Prop 409 Residential Streets", any new asphalt that is disturbed will require a 2" mill and overlay for 50' in each direction from the outside of the cut for all effected travel lanes.
Total Completed Inspections - 1
Date Description Inspector Results Comments
02/24/2020 TDOT-EXCAV GENERAL INSPECTION BMONG Approved COMPLETE