Barricade and Excavation
Apply Date:
12/02/2019
Applicant:
TUCSON ELECTRIC POWER **B
Description:
Install six (6) new poles, four (4) new guys/anchors and one (1) 1200kVAR capacitor Remove six (6) poles, three (3) spans of 4/0 ACSR feeder wire, one (1) 1200kVAR capacitor and one (1) GOAB switch. Complete two(2) 6" feeder risers and remove two(2) Remove apprx 310' of 1100 AL 3C UG feeder cable Install apprx 869' of 1100 AL 3C UG feeder cable Install new PME-11 and make connections Make connections at two(2) existing pullboxes and one(1) existing PME-10. Remove UG secondary and secondary pedestal and replace 3 UG runs of 1/0 AL 3-2C UG 3PHZ cable. WO#s 6283980, 6285750, 6288296.

Completed Inspections

Permit Status: Final
Permit Number: T19RW07342
Permit Description: Install six (6) new poles, four (4) new guys/anchors and one (1) 1200kVAR capacitor Remove six (6) poles, three (3) spans of 4/0 ACSR feeder wire, one (1) 1200kVAR capacitor and one (1) GOAB switch. Complete two(2) 6" feeder risers and remove two(2) Remove apprx 310' of 1100 AL 3C UG feeder cable Install apprx 869' of 1100 AL 3C UG feeder cable Install new PME-11 and make connections Make connections at two(2) existing pullboxes and one(1) existing PME-10. Remove UG secondary and secondary pedestal and replace 3 UG runs of 1/0 AL 3-2C UG 3PHZ cable. WO#s 6283980, 6285750, 6288296.
Total Completed Inspections - 1
Date Description Inspector Results Comments
09/30/2020 TDOT-EXCAV GENERAL INSPECTION BMONG Approved NO WORK VISABLE

Documents

File Name Document Type  
T19RW07342.PDF ROW-RIGHT OF WAY VIEW