Permit: T19RW07289
Permit Details
Apply Date:
11/27/2019
Applicant:
THE ZAYO GROUP
Description:
Place 3-1.25 conduits starting at the northwest corner of Tyndall and 6th St, going east 419ft then place a vault then north on the east side of Park Ave 1489ft then remove and replace a vault. (Mellowcat 6 SC - T19RW03334) WORK WILL BE RESTRICTED ON DECEMBER 31, 2019 AND JANUARY 1ST DUE TO THE NOVA HOME BOWL. TRAFFIC CONTROL DEVICES MUST BE REMOVED EVENING OF DECEMBER 30, 2019 AND MAY BE RETURNED ON JANUARY 2, 2020. CONTRACTOR SHALL NOT SET UP TRAFFFIC CONTROL PRIOR TO 6:00 AM AND SHALL BE REMOVED PRIOR TO 6:00 PM. OPEN TRENCH AREAS MUST BE PLATED AND SECURED AFTER HOURS. BUSINESS AND ADA PEDESTRIAN ACCESS MUST BE MAINTAINED PER MUTCD ALONG PARK AVE. FLAGGERS MUST BE PRESENT FOR THE DURATION OF THIS PROJECT. U OF A'S PROGRAM COORDINATOR/ SPECIAL EVENTS OPERATIONS - PARKING AND TRANSPORTATION SERVICE REP MUST BE NOTIFIED OF ALL WORK AND CHANGES TO SCOPE OF WORK. (520) 621-3300 AS THE CONTRACTOR, YOU MUST FOLLOW THE RUNNING LINE SUBMITTED TO THE CITY, IF DEVIATED, A REVISION MUST BE SUBMITTED AND APPROVED BEFORE CONTINUING WORK. 12/20/19 - Changed running line at Sta 57+91 to field bend from 13.5' Rt to 58+09 5.5' Rt then run north 200ft to 60+09 5.5' Rt field bend to 60+30 10' Rt per preconstruction meeting.
Contractors:
- DIVERSIFIED SOLUTIONS OF ARIZONA INC (FN)
- QUAIL CONSTRUCTION LLC
Completed Inspections
Permit Status: Final
Permit Number: T19RW07289
Permit Description: Place 3-1.25 conduits starting at the northwest corner of Tyndall and 6th St, going east 419ft then place a vault then north on the east side of Park Ave 1489ft then remove and replace a vault. (Mellowcat 6 SC - T19RW03334)
WORK WILL BE RESTRICTED ON DECEMBER 31, 2019 AND JANUARY 1ST DUE TO THE NOVA HOME BOWL. TRAFFIC CONTROL DEVICES MUST BE REMOVED EVENING OF DECEMBER 30, 2019 AND MAY BE RETURNED ON JANUARY 2, 2020.
CONTRACTOR SHALL NOT SET UP TRAFFFIC CONTROL PRIOR TO 6:00 AM AND SHALL BE REMOVED PRIOR TO 6:00 PM.
OPEN TRENCH AREAS MUST BE PLATED AND SECURED AFTER HOURS.
BUSINESS AND ADA PEDESTRIAN ACCESS MUST BE MAINTAINED PER MUTCD ALONG PARK AVE. FLAGGERS MUST BE PRESENT FOR THE DURATION OF THIS PROJECT.
U OF A'S PROGRAM COORDINATOR/ SPECIAL EVENTS OPERATIONS - PARKING AND TRANSPORTATION SERVICE REP MUST BE NOTIFIED OF ALL WORK AND CHANGES TO SCOPE OF WORK. (520) 621-3300
AS THE CONTRACTOR, YOU MUST FOLLOW THE RUNNING LINE SUBMITTED TO THE CITY, IF DEVIATED, A REVISION MUST BE SUBMITTED AND APPROVED BEFORE CONTINUING WORK.
12/20/19 - Changed running line at Sta 57+91 to field bend from 13.5' Rt to 58+09 5.5' Rt then run north 200ft to 60+09 5.5' Rt field bend to 60+30 10' Rt per preconstruction meeting.
Total Completed Inspections - 1
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/30/2019 | TDOT-EXCAV GENERAL INSPECTION | DR | Approved | TC OK. No work on 12/31 for Bowl Game. |