Permit: T19RW06862
Permit Details
Status:
Final
Type:
Barricade and Excavation
Address:
2737 N RICHEY BL
Address NEW:
2737 N RICHEY BL
Apply Date:
11/07/2019
Applicant:
TUCSON CLEAN AND BEAUTIFUL
Description:
TRAFFIC CALMING AND STORMWATER HARVESTING ELEMENTS TO BE INSTALLED ON N.RICHEY BLVD AND AT THE INTERSECTION OF E.BERMUDA ST 16' DIAMETER TRAFFIC CIRCLE -INTERSECTION OF N. RICHEY BLVD AND E.BERMUDA ST 8'X 22' CHICANE -2737 N RICHEY ST ALL PLANTING WILL BE INSTALLED AND MAINTAINED BY THE NEIGHBORHOOD GROUP WITH SUPPORT PROVIDED THROUGH TUCSON CLEAN AND BEAUTIFUL TRAFFIC CIRCLES DODGE FLOWER TRAFFIC CIRCLE INSTALLATION OF A TRAFFIC CIRCLE PER STANDARD DETAILS 110 OR APPROVED PLANS TO HARVEST STORMWATER, CALM TRAFFIC, AND ENHANCE TREE CANOPY. THE PROJECT IS ASSOCIATED WITH TUCSON WATER AND TUCSON CLEAN AND BEAUTIFUL'S NEIGHBORHOOD SCALE STORMWATER HARVESTING GRANT. CONTACT JESSE SOTO, NEIGHBORHOOD TRAFFIC MANAGEMENT, AT 520-791-4259 THREE WEEKS PRIOR TO STARTING WORK SO THAT LOCATION MAY BE MARKED.
Contractors:
- DAY'S EXCAVATING INC
- DESERT LIVING INC ,
Completed Inspections
Permit Status: Final
Permit Number: T19RW06862
Permit Description: TRAFFIC CALMING AND STORMWATER HARVESTING ELEMENTS TO BE INSTALLED ON N.RICHEY BLVD AND AT THE INTERSECTION OF E.BERMUDA ST
16' DIAMETER TRAFFIC CIRCLE
-INTERSECTION OF N. RICHEY BLVD AND E.BERMUDA ST
8'X 22' CHICANE
-2737 N RICHEY ST
ALL PLANTING WILL BE INSTALLED AND MAINTAINED BY THE NEIGHBORHOOD GROUP WITH SUPPORT PROVIDED THROUGH TUCSON CLEAN AND BEAUTIFUL
TRAFFIC CIRCLES
DODGE FLOWER TRAFFIC CIRCLE
INSTALLATION OF A TRAFFIC CIRCLE PER STANDARD DETAILS 110 OR APPROVED PLANS TO HARVEST STORMWATER, CALM TRAFFIC, AND ENHANCE TREE CANOPY. THE PROJECT IS ASSOCIATED WITH TUCSON WATER AND TUCSON CLEAN AND BEAUTIFUL'S NEIGHBORHOOD SCALE STORMWATER HARVESTING GRANT.
CONTACT JESSE SOTO, NEIGHBORHOOD TRAFFIC MANAGEMENT, AT 520-791-4259 THREE WEEKS PRIOR TO STARTING WORK SO THAT LOCATION MAY BE MARKED.
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/10/2019 | TDOT-Routine Barricade Inspect | DR | Approved | Work complete. Barricades blown over in storm. Called Days Excavating to maintain. |