Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
Barricade and Excavation
Apply Date:
10/30/2019
Applicant:
B & F CONTRACTING INC
Description:
INSTALLATION OF APPROXIMATELY 334 LF OF 8" CIPP LINING BETWEEN MH #9809-193 AND 9809-194. BOTH MH WILL HAVE NEW CONTRETE COLLARS INSTALLED AS WELL AS INTERNAL BENCH REHABILITATION PEFORMED. TRAFFIC CONTROL WILL BE A FOOTBALL ON E FAIRMONT AND A CENTER LANE CLOSURE ON N COLUMBUS WITH NO LEFT TURNS PERMITED ONTO COLUMBUS FROM E FAIRMONT ST.
Contractors:
  • HOFFMAN PROFESSIONAL PIPE SERVICES
  • OLSEN PRECAST STRUCTURES

Completed Inspections

Permit Status: Final
Permit Number: T19RW06664
Permit Description: INSTALLATION OF APPROXIMATELY 334 LF OF 8" CIPP LINING BETWEEN MH #9809-193 AND 9809-194. BOTH MH WILL HAVE NEW CONTRETE COLLARS INSTALLED AS WELL AS INTERNAL BENCH REHABILITATION PEFORMED. TRAFFIC CONTROL WILL BE A FOOTBALL ON E FAIRMONT AND A CENTER LANE CLOSURE ON N COLUMBUS WITH NO LEFT TURNS PERMITED ONTO COLUMBUS FROM E FAIRMONT ST.
Total Completed Inspections - 1
Date Description Inspector Results Comments
01/10/2020 TDOT-EXCAV GENERAL INSPECTION MVV Approved Completed. Concrete collars completed. Asphalt not affected.

Documents

File Name Document Type  
T19RW06664.PDF ROW-RIGHT OF WAY VIEW