Permit: T19RW06654
Permit Details
Apply Date:
10/30/2019
Applicant:
V.W. CONNECT LLC
Description:
TO EXCAVATE AND INSTALL CONDUIT FOR TUCSON ELETRIC POWER. THE PROJECT IS THE HAMPTON INN. FIBER FOR CITY OF TUCSON PERMIT END DATE HAS BEEN MODIFIED DUE TO HOLIDAY RESTRICTION BEGINNING NOVEMBER 28TH 2019 - JANUARY 2ND 2020. This project is located in an ARCHAELOGICAL SENSITIVE ZONE. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Allison Diehl at allison.diehl@tucsonaz.gov with any questions
Completed Inspections
Permit Status: Final
Permit Number: T19RW06654
Permit Description: TO EXCAVATE AND INSTALL CONDUIT FOR TUCSON ELETRIC POWER. THE PROJECT IS THE HAMPTON INN. FIBER FOR CITY OF TUCSON
PERMIT END DATE HAS BEEN MODIFIED DUE TO HOLIDAY RESTRICTION BEGINNING NOVEMBER 28TH 2019 - JANUARY 2ND 2020.
This project is located in an ARCHAELOGICAL SENSITIVE ZONE. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Allison Diehl at allison.diehl@tucsonaz.gov with any questions
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/11/2019 | TDOT-EXCAV GENERAL INSPECTION | Bravin | Approved | Conduit has been installed across stone and up through the east side of Corral. Stone crossing has been slurried and asphalt patch will be completed with repaving of Corral. Paving of area will be in conjuction with work for the new Hampton Hotel going up. all patching will be hot patched until final pave |