Permit Details

Status:
Final
Type:
Barricade and Excavation
Apply Date:
10/30/2019
Applicant:
T2 UES
Description:
AIR-VACUUM EXCAVATION OF 5 UTILITY POTHOLES APPROXIMATELY 12" X 12" IN SIZE ALONG SHOULDER OF ALVERNON WAY FOR THE DESIGN PHASE OF TUCSON WATER AEROSPACE CORRIDOR 16" WATER LINE PROJECT. NOTE: ALVERNON WAY is under a pavement moratorium, any new asphalt that is disturbed will require a 2" mill and overlay for 50' in each direction from the outside of the cut for all effected travel lanes. ADDRESS ON APPLICATION 8800 S ALVERNON WAY
Contractors:
  • TRAFFICADE SERVICE INC

Completed Inspections

Permit Status: Final
Permit Number: T19RW06648
Permit Description: AIR-VACUUM EXCAVATION OF 5 UTILITY POTHOLES APPROXIMATELY 12" X 12" IN SIZE ALONG SHOULDER OF ALVERNON WAY FOR THE DESIGN PHASE OF TUCSON WATER AEROSPACE CORRIDOR 16" WATER LINE PROJECT. NOTE: ALVERNON WAY is under a pavement moratorium, any new asphalt that is disturbed will require a 2" mill and overlay for 50' in each direction from the outside of the cut for all effected travel lanes. ADDRESS ON APPLICATION 8800 S ALVERNON WAY
Total Completed Inspections - 1
Date Description Inspector Results Comments
12/17/2019 TDOT-EXCAV GENERAL INSPECTION Bravin Approved Potholing complete on permit, no issues with repairs. all work off of roadway

Documents

File Name Document Type  
T19RW06648.PDF ROW-RIGHT OF WAY VIEW