Permit: T19RW06579
Permit Details
Apply Date:
10/28/2019
Applicant:
TUCSON DEPARTMENT OF TRANSPORTATION
Description:
BICYCLE/PEDESTRIAN PROGRAM SERVICES, CONTRACT NO. 171677, PO NO. 40459 INSTALLATION OF 3 BIKE RACKS IN THE RIGHT-OF-WAY BETWEEN THE CURB AND THE SIDEWALK ALONG 6TH AVE. NO ROAD OR SIDEWALK CLOSURE IS REQUIRED. TOTAL INSTALLATION TIME IS APPROXIMATELY 45 MINUTES.
Contractors:
- LIVING STREETS ALLIANCE
Completed Inspections
Permit Status: Final
Permit Number: T19RW06579
Permit Description: BICYCLE/PEDESTRIAN PROGRAM SERVICES, CONTRACT NO. 171677, PO NO. 40459
INSTALLATION OF 3 BIKE RACKS IN THE RIGHT-OF-WAY BETWEEN THE CURB AND THE SIDEWALK ALONG 6TH AVE.
NO ROAD OR SIDEWALK CLOSURE IS REQUIRED. TOTAL INSTALLATION TIME IS APPROXIMATELY 45 MINUTES.
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/02/2019 | TDOT-Routine Barricade Inspect | DR | Approved | Bike Rack install. Final. |