Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T19RW06422
Permit Details
Apply Date:
10/23/2019
Applicant:
SOUTHWEST GAS
Description:
(2) 5X5 BELLHOLES IN THE DIRT AND TRENCH TO REPLACE GAS SERVICE NOTES: This road is under a pavement moratorium, any new asphalt that is disturbed will require a 2" mill and overlay for 50' in each direction from the outside of the cut for all effected travel lanes.
Contractors:
- ARIZONA PIPELINE COMPANY
- NATIONAL BARRICADE LLC
- NORTHERN PIPELINE CONSTRUCTION C
Completed Inspections
Permit Status: Final
Permit Number: T19RW06422
Permit Description: (2) 5X5 BELLHOLES IN THE DIRT AND TRENCH TO REPLACE GAS SERVICE
NOTES:
This road is under a pavement moratorium, any new asphalt that is disturbed will require a 2" mill and overlay for 50' in each direction from the outside of the cut for all effected travel lanes.
Total Completed Inspections - 1
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/06/2020 | TDOT-EXCAV GENERAL INSPECTION | A.Gomez | Approved | Gas service completed, no issues. |