Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
Barricade and Excavation
Apply Date:
10/15/2019
Applicant:
SOUTHWEST GAS
Description:
SOUTHWEST GAS (SWG) RELOCATION IN RELATION TO ADOT'S I-10 AND RUTHRAUFF RD TI PROJECT (PROJECT NO. 010 PM 252 H8480 01 C). SWG INSTALLATION OF APPROXIMATELY 3,059' WITHIN ADOT ROW OF 4" PLASTIC GAS MAIN ON THE WEST SIDE OF I-10. CONTRACTOR SHALL PLATE TRENCH ON EL CAMINO DEL CERRO AND REMOVE TRAFFIC CONTROL PRIOR TO 3:30PM WORK ON EL CAMINO DEL CERRO-CITY LIMITS ONLY

Outstanding Inspections

Permit Status: Final
Permit Number: T19RW06095
Permite Description: SOUTHWEST GAS (SWG) RELOCATION IN RELATION TO ADOT'S I-10 AND RUTHRAUFF RD TI PROJECT (PROJECT NO. 010 PM 252 H8480 01 C). SWG INSTALLATION OF APPROXIMATELY 3,059' WITHIN ADOT ROW OF 4" PLASTIC GAS MAIN ON THE WEST SIDE OF I-10. CONTRACTOR SHALL PLATE TRENCH ON EL CAMINO DEL CERRO AND REMOVE TRAFFIC CONTROL PRIOR TO 3:30PM WORK ON EL CAMINO DEL CERRO-CITY LIMITS ONLY
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
11/05/2019 TDOT-EXCAV GENERAL INSPECTION N/A Continued SWG line relocation for ADOT Job. Project on hold.

Documents

File Name Document Type  
T19RW06095.PDF ROW-RIGHT OF WAY VIEW
T19RW06095 R1.PDF ROW-RIGHT OF WAY VIEW
T19RW06095 R2.PDF ROW-RIGHT OF WAY VIEW
T19RW06095 -R3.PDF ROW-RIGHT OF WAY VIEW