Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
Barricade and Excavation
Apply Date:
10/15/2019
Applicant:
SOUTHWEST GAS
Description:
(2) 5 X 5 BELLHOLES IN DIRT/BLK TOP ON PARK AV AND APPROX. 35 FT TRENCH TO PERMANENTLY ABANDON GAS LINE PLEASE BE COURSTEY WITH OTHER CONTRACTORS IN THIS AREA, COORDINATE PROJECT IF POSSIBLE. 10/16/2019- PLAN CHANGE LANE SHIFT WILL BEGIN 300 SOUTH OF SPEEDWAY AND END 75 FT SOUTH OF SPEEDWAY; THIS WILL NOT IMPACT SUNLINK SERVICE

Completed Inspections

Permit Status: Final
Permit Number: T19RW06092
Permit Description: (2) 5 X 5 BELLHOLES IN DIRT/BLK TOP ON PARK AV AND APPROX. 35 FT TRENCH TO PERMANENTLY ABANDON GAS LINE PLEASE BE COURSTEY WITH OTHER CONTRACTORS IN THIS AREA, COORDINATE PROJECT IF POSSIBLE. 10/16/2019- PLAN CHANGE LANE SHIFT WILL BEGIN 300 SOUTH OF SPEEDWAY AND END 75 FT SOUTH OF SPEEDWAY; THIS WILL NOT IMPACT SUNLINK SERVICE
Total Completed Inspections - 1
Date Description Inspector Results Comments
12/03/2019 TDOT-EXCAV GENERAL INSPECTION DR Approved Expired. Temp patch. SWG contacted to renew or reapply.

Documents

File Name Document Type  
T19RW06092.PDF ROW-RIGHT OF WAY VIEW
T19RW06092 R1.PDF ROW-RIGHT OF WAY VIEW