Permit: T19RW06042
Permit Details
Apply Date:
10/11/2019
Applicant:
COX COMMUNICATIONS
Description:
Starting on the South side of E Ajo and West of Park Ave Riser up and Overlash 1065' going East and Riser down. NOTES: OTHER PROJECTS/ACTIVITIES ACTIVE IN AREA, AS A CONTRACTOR YOU MUST COORDINATE WITH EXISTING TRAFFIC CONTROLE AND WORKERS. YOU WILL HAVE TO NOTIFY SUNTRAN 24 HOURS PRIOR TO WORK SUN TRAN CONTACTS: BEA PAULUS 520-206-8826 CHRISTINA ROCK 520-206-8934 ***This street is under a pavement moratorium, any new asphalt that is disturbed will require a 2" mill and overlay for 50' in each direction from the outside of the cut for all effected travel lanes.*** A NOTICE OF TEMPORARY HOLIDAY RESTRICTION applies to this permit and will be in effect from Thanksgiving Day to January 2. Due to the increasing traffic volume on many of the City's roads, it is necessary to restrict lane closures on certain roads during the holiday season.
Contractors:
- BEAR COMMUNICATIONS OF NEW MEXICO INC
- DESERT BARRICADES L L C
Completed Inspections
Permit Status: Final
Permit Number: T19RW06042
Permit Description: Starting on the South side of E Ajo and West of Park Ave Riser up and Overlash 1065' going East and Riser down.
NOTES:
OTHER PROJECTS/ACTIVITIES ACTIVE IN AREA, AS A CONTRACTOR YOU MUST COORDINATE WITH EXISTING TRAFFIC CONTROLE AND WORKERS.
YOU WILL HAVE TO NOTIFY SUNTRAN 24 HOURS PRIOR TO WORK
SUN TRAN CONTACTS: BEA PAULUS 520-206-8826
CHRISTINA ROCK 520-206-8934
***This street is under a pavement moratorium, any new asphalt that is disturbed will require a 2" mill and overlay for 50' in each direction from the outside of the cut for all effected travel lanes.***
A NOTICE OF TEMPORARY HOLIDAY RESTRICTION applies to this permit and will be in effect from Thanksgiving Day to January 2. Due to the increasing traffic volume on many of the City's roads, it is necessary to restrict lane closures on certain roads during the holiday season.
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/20/2020 | TDOT-EXCAV GENERAL INSPECTION | Bravin | Approved | all work was arial, and riser complete. No repairs or issues |