Permit Details

Status:
Final
Type:
Barricade and Excavation
Apply Date:
10/10/2019
Applicant:
K E & G CONSTRUCTION ***APA***
Description:
Installation of 332LF of 8-inch CIPP Lining between manholes 9427-13 to 9427-05. Installation of 246LF of 8-inch CIPP Lining between manholes 4207-11 to 9427-15. Provide MH rehabilitation and install new collars for manholes 9427-13, 9247-05, 4207-12, 4207-13, 4207-14, and 9427-15. A one day 24-hour closure required for manhole collars to cure.
Contractors:
  • INSITUFORM TECHNOLOGIES LLC
  • PROFESSIONAL PIPE SERVICES

Completed Inspections

Permit Status: Final
Permit Number: T19RW06007
Permit Description: Installation of 332LF of 8-inch CIPP Lining between manholes 9427-13 to 9427-05. Installation of 246LF of 8-inch CIPP Lining between manholes 4207-11 to 9427-15. Provide MH rehabilitation and install new collars for manholes 9427-13, 9247-05, 4207-12, 4207-13, 4207-14, and 9427-15. A one day 24-hour closure required for manhole collars to cure.
Total Completed Inspections - 1
Date Description Inspector Results Comments
01/31/2020 TDOT-EXCAV GENERAL INSPECTION A.Gomez Approved Work completed, new concrete collars placed. No issues.

Documents

File Name Document Type  
T19RW06007.PDF ROW-RIGHT OF WAY VIEW