Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
Barricade and Excavation
Address:
4 E DELTA RD
Apply Date:
10/07/2019
Applicant:
TUCSON ELECTRIC POWER **B
Description:
INSTALL 1 NEW POLE AND 2 NEW ANCHORS IN ROW. THE POLE HOLES WILL BE 20"-24" IN DIAMETER AND 6' DEEP.

Completed Inspections

Permit Status: Final
Permit Number: T19RW05891
Permit Description: INSTALL 1 NEW POLE AND 2 NEW ANCHORS IN ROW. THE POLE HOLES WILL BE 20"-24" IN DIAMETER AND 6' DEEP.
Total Completed Inspections - 1
Date Description Inspector Results Comments
11/04/2019 TDOT-EXCAV GENERAL INSPECTION Bravin Approved new pole has been installed. No issues or repairs needed.

Documents

File Name Document Type  
T19RW05891.PDF ROW-RIGHT OF WAY VIEW
T19RW05891 R1.PDF ROW-RIGHT OF WAY VIEW
T19RW05891 R1.PDF ROW-RIGHT OF WAY VIEW