Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T19RW05889
Permit Details
Apply Date:
10/04/2019
Applicant:
CENTURYLINK
Description:
N.589869 - Job will require access to MH #14171 to place new fiber. NOTES: OTHER PROJECTS/ACTIVITIES ACTIVE IN AREA, AS A CONTRACTOR YOU MUST COORDINATE WITH EXISTING TRAFFIC CONTROLE AND WORKERS. * BUSINESS ACCESS MUST BE MAINTAINED AND SIGNED YOU WILL HAVE TO NOTIFY SUN TRAN 1 DAY BEFORE WORK, PLEASE CONTACT A SUN TRAN REPRESENTATIVE SUN TRAN CONTACTS: BEA PAULUS 520-206-8826 CHRISTINA ROCK 520-206-8934 A NOTICE OF TEMPORARY HOLIDAY RESTRICTION applies to this permit and will be in effect from Thanksgiving Day to January 2. Due to the increasing traffic volume on many of the City's roads, it is necessary to restrict lane closures on certain roads during the holiday season. TDOT Engineering will grant an exception for documented emergency work or on-going construction work. Night work is approved for this project from 10 P.M. to 6 A.M. until January 2.
Contractors:
- TEAM FISHEL
- TRAFFICADE SERVICE INC
Completed Inspections
Permit Status: Final
Permit Number: T19RW05889
Permit Description: N.589869 - Job will require access to MH #14171 to place new fiber.
NOTES:
OTHER PROJECTS/ACTIVITIES ACTIVE IN AREA, AS A CONTRACTOR YOU MUST COORDINATE WITH EXISTING TRAFFIC CONTROLE AND WORKERS.
* BUSINESS ACCESS MUST BE MAINTAINED AND SIGNED
YOU WILL HAVE TO NOTIFY SUN TRAN 1 DAY BEFORE WORK, PLEASE CONTACT A SUN TRAN REPRESENTATIVE
SUN TRAN CONTACTS: BEA PAULUS 520-206-8826 CHRISTINA ROCK 520-206-8934
A NOTICE OF TEMPORARY HOLIDAY RESTRICTION applies to this permit and will be in effect from Thanksgiving Day to January 2. Due to the increasing traffic volume on many of the City's roads, it is necessary to restrict lane closures on certain roads during the holiday season. TDOT Engineering will grant an exception for documented emergency work or on-going construction work. Night work is approved for this project from 10 P.M. to 6 A.M. until January 2.
Total Completed Inspections - 1
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/27/2019 | TDOT-EXCAV GENERAL INSPECTION | Bravin | Approved | MH access only for Fiber, No issues |