Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
Barricade and Excavation
Apply Date:
10/03/2019
Applicant:
CENTURYLINK
Description:
N.545548 - Job will require access to MH #12760 to place new fiber. Bore 287' of new futurepath from a new 3048 HH to MH #12760. NOTES: NO PAVEMENT CUTS PERMITTED WITHIN HOUGHTON ROAD - UNDER PAVEMENT MORATORIUM Any new asphalt that is disturbed will require a 2" mill and overlay for 50' in each direction from the outside of the cut for all effected travel lanes. YOU WILL HAVE TO NOTIFY SUN TRAN 1 DAY BEFORE WORK, PLEASE CONTACT A SUN TRAN REPRESENTATIVE SUN TRAN CONTACTS: BEA PAULUS 520-206-8826 CHRISTINA ROCK 520-206-8934 A NOTICE OF TEMPORARY HOLIDAY RESTRICTION applies to this permit and will be in effect from Thanksgiving Day to January 2. Due to the increasing traffic volume on many of the City's roads, it is necessary to restrict lane closures on certain roads during the holiday season. TDOT Engineering will grant an exception for documented emergency work or on-going construction work. Night work is approved for this project from 10 P.M. to 6 A.M. until January 2.
Contractors:
  • FISHEL CONSTRUCTION COMPANY (FN)
  • TRAFFICADE SERVICE INC

Completed Inspections

Permit Status: Final
Permit Number: T19RW05857
Permit Description: N.545548 - Job will require access to MH #12760 to place new fiber. Bore 287' of new futurepath from a new 3048 HH to MH #12760. NOTES: NO PAVEMENT CUTS PERMITTED WITHIN HOUGHTON ROAD - UNDER PAVEMENT MORATORIUM Any new asphalt that is disturbed will require a 2" mill and overlay for 50' in each direction from the outside of the cut for all effected travel lanes. YOU WILL HAVE TO NOTIFY SUN TRAN 1 DAY BEFORE WORK, PLEASE CONTACT A SUN TRAN REPRESENTATIVE SUN TRAN CONTACTS: BEA PAULUS 520-206-8826 CHRISTINA ROCK 520-206-8934 A NOTICE OF TEMPORARY HOLIDAY RESTRICTION applies to this permit and will be in effect from Thanksgiving Day to January 2. Due to the increasing traffic volume on many of the City's roads, it is necessary to restrict lane closures on certain roads during the holiday season. TDOT Engineering will grant an exception for documented emergency work or on-going construction work. Night work is approved for this project from 10 P.M. to 6 A.M. until January 2.
Total Completed Inspections - 1
Date Description Inspector Results Comments
11/05/2019 TDOT-EXCAV GENERAL INSPECTION BMONG Approved THERE ARE ORANGE WISKERS ON BOTH SIDES OF COWHEAD. NO PAVEMENT HAS BEEN DESTRUBED