Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
Barricade Only
Address:
1850 E 22ND ST
Address NEW:
1850 E 22ND ST
Apply Date:
10/01/2019
Applicant:
AECOM TECHNICAL SERVICES, INC.
Description:
In-depth bridge inspection of the 22nd St SPRR Overpass (#09011) from City and UPRR R/W. Work includes using a man-lift and/or bucket truck inspect the bridge deck and girders with a partial closures of 22nd St, Aviation Parkway, and Campbell Ave. NOTES: ADRESS CHANGED TO REFLECT TRAFFIC CONROLE PLANS FROM: "22nd St SPRR Overpass" TO "1850 E 22ND ST" A NOTICE OF TEMPORARY HOLIDAY RESTRICTION applies to this permit and will be in effect from Thanksgiving Day to January 2. Due to the increasing traffic volume on many of the City's roads, it is necessary to restrict lane closures on certain roads during the holiday season. TDOT Engineering will grant an exception for documented emergency work or on-going construction work. Night work is approved for this project from 10 P.M. to 6 A.M. until January 2. ADOT PERMIT ATTACHED YOU WILL HAVE TO NOTIFY SUN TRAN 1 DAY BEFORE WORK PLEASE CONTACT A SUN TRAN REPRESENTATIVE SUN TRAN CONTACTS: BEA PAULUS 520-206-8826 CHRISTINA ROCK 520-206-8934

Completed Inspections

Permit Status: Final
Permit Number: T19RW05806
Permit Description: In-depth bridge inspection of the 22nd St SPRR Overpass (#09011) from City and UPRR R/W. Work includes using a man-lift and/or bucket truck inspect the bridge deck and girders with a partial closures of 22nd St, Aviation Parkway, and Campbell Ave. NOTES: ADRESS CHANGED TO REFLECT TRAFFIC CONROLE PLANS FROM: "22nd St SPRR Overpass" TO "1850 E 22ND ST" A NOTICE OF TEMPORARY HOLIDAY RESTRICTION applies to this permit and will be in effect from Thanksgiving Day to January 2. Due to the increasing traffic volume on many of the City's roads, it is necessary to restrict lane closures on certain roads during the holiday season. TDOT Engineering will grant an exception for documented emergency work or on-going construction work. Night work is approved for this project from 10 P.M. to 6 A.M. until January 2. ADOT PERMIT ATTACHED YOU WILL HAVE TO NOTIFY SUN TRAN 1 DAY BEFORE WORK PLEASE CONTACT A SUN TRAN REPRESENTATIVE SUN TRAN CONTACTS: BEA PAULUS 520-206-8826 CHRISTINA ROCK 520-206-8934
Total Completed Inspections - 1
Date Description Inspector Results Comments
11/19/2019 TDOT-EXCAV GENERAL INSPECTION Bravin Approved Bridge inspection complete. No issues