Permit: T19RW05676
Permit Details
Apply Date:
09/27/2019
Applicant:
SOLON CORPORATION ***APA***
Description:
OPEN TRENCH EXCAVATION FOR INSTALLATION OF NEW 4-INCH ELECTRICAL CONDUIT (1 EACH), APPROX. 100 FEET ABOVE EXISTING BOX CULVERT IN ORDER TO CONNECT FUTURE COMMS. CONDUIT AREA FROM NEW GEICO HQ'S TO NEW/ FUTURE TEP KINO SUBSTATION.
Completed Inspections
Permit Status: Final
Permit Number: T19RW05676
Permit Description: OPEN TRENCH EXCAVATION FOR INSTALLATION OF NEW 4-INCH ELECTRICAL CONDUIT (1 EACH), APPROX. 100 FEET ABOVE EXISTING BOX CULVERT IN ORDER TO CONNECT FUTURE COMMS. CONDUIT AREA FROM NEW GEICO HQ'S TO NEW/ FUTURE TEP KINO SUBSTATION.
Total Completed Inspections - 1
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/10/2019 | TDOT-EXCAV GENERAL INSPECTION | Bravin | Approved | 100 ft of 4in conduit was installed, with a concrete cap over the pipe that is on top of existing box culvert. TEPs request. No traffic contol used because job was completed inside a existing Borderland job. No issues or further repairs needed |