Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
Barricade and Excavation
Apply Date:
09/26/2019
Applicant:
AZTEC ENGINEERING GROUP INC
Description:
This project is to provide 5 utility potholes to confirm horizontal and vertical location of water utility conflicts soil nails for shoring connected to new development. ADDRESS ON APPLICATION- Park Ave south of Speedway Blvd.

Completed Inspections

Permit Status: Final
Permit Number: T19RW05638
Permit Description: This project is to provide 5 utility potholes to confirm horizontal and vertical location of water utility conflicts soil nails for shoring connected to new development. ADDRESS ON APPLICATION- Park Ave south of Speedway Blvd.
Total Completed Inspections - 1
Date Description Inspector Results Comments
10/07/2019 TDOT-EXCAV GENERAL INSPECTION DR Approved Work complete. Final.

Documents

File Name Document Type  
T19RW05638.PDF ROW-RIGHT OF WAY VIEW