Permit: T19RW05531
Permit Details
Apply Date:
09/23/2019
Applicant:
K E & G CONSTRUCTION ***APA***
Description:
Installation of 25LF of 8-inch CIPP Lining between manholes 8137-09 and 8137-08. Provide MH rehabilitation and install new collars for manholes 8137-09 and 8137-08. A one day 24-hour closure required for manhole collars to cure. ADDRESS ON APPLICATION-199 W WASHINGTON ST
Contractors:
- PROPIPE
Completed Inspections
Permit Status: Final
Permit Number: T19RW05531
Permit Description: Installation of 25LF of 8-inch CIPP Lining between manholes 8137-09 and 8137-08. Provide MH rehabilitation and install new collars for manholes 8137-09 and 8137-08. A one day 24-hour closure required for manhole collars to cure.
ADDRESS ON APPLICATION-199 W WASHINGTON ST
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/11/2019 | TDOT-EXCAV GENERAL INSPECTION | DR | Approved | 2 new Manhole collars installed at Washington and Court. Final. No Issues. |