Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
Barricade Only
Apply Date:
09/23/2019
Applicant:
K E & G CONSTRUCTION ***APA***
Description:
Installation of 25LF of 8-inch CIPP Lining between manholes 8137-09 and 8137-08. Provide MH rehabilitation and install new collars for manholes 8137-09 and 8137-08. A one day 24-hour closure required for manhole collars to cure. ADDRESS ON APPLICATION-199 W WASHINGTON ST
Contractors:
  • PROPIPE

Completed Inspections

Permit Status: Final
Permit Number: T19RW05531
Permit Description: Installation of 25LF of 8-inch CIPP Lining between manholes 8137-09 and 8137-08. Provide MH rehabilitation and install new collars for manholes 8137-09 and 8137-08. A one day 24-hour closure required for manhole collars to cure. ADDRESS ON APPLICATION-199 W WASHINGTON ST
Total Completed Inspections - 1
Date Description Inspector Results Comments
12/11/2019 TDOT-EXCAV GENERAL INSPECTION DR Approved 2 new Manhole collars installed at Washington and Court. Final. No Issues.

Documents

File Name Document Type  
T19RW05531.PDF ROW-RIGHT OF WAY VIEW
T19RW05531 R1.PDF ROW-RIGHT OF WAY VIEW