Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
Barricade and Excavation
Address NEW:
5667 E SPEEDWAY BL
Apply Date:
09/14/2019
Applicant:
TUCSON ELECTRIC POWER **B
Description:
REPLACE (1) POLE. WORK ON SHOULDER TO REPLACE POLE AND TRANSFORMER BANK

Completed Inspections

Permit Status: Final
Permit Number: T19RW05242
Permit Description: REPLACE (1) POLE. WORK ON SHOULDER TO REPLACE POLE AND TRANSFORMER BANK
Total Completed Inspections - 1
Date Description Inspector Results Comments
11/20/2019 TDOT-EXCAV GENERAL INSPECTION MVV Approved Old electric rack was removed from a paved section of parking lot. New pole installed and all electrical work completed. Sidewalk area not affected.

Documents

File Name Document Type  
T19RW05242.PDF ROW-RIGHT OF WAY VIEW