Permit: T19RW05196
Permit Details
Apply Date:
09/13/2019
Applicant:
B & F CONTRACTING
Description:
INSTALLING APPROXIMATELY 182 LF OF 10" CIPP LINING BETWEEN MANHOLE 4674-17-1 AND 4674-17 ADDDITIONALLY B & F WILL BE INSTALLING NEW CONCRETE COLLARS AND PERFORMING A INTERNAL BENCH REHAB ON BOTH MANHOLES. TRAFFIC CONTROL WILL BE RESTRICTED TO ONE LANE (CURB LANES) IN ALL DIRECTIONS WITH NO LEFT TURNS ALLOWED FOR THE ENTIRE INTERSECTION OF GRANT & ALVERNON WORK WILL BE CONDUCTED IN THE EVENING HOURS. CONTRACTOR SHALL REMOVE TRAFFIC CONTROL IN THE MORNING PRIOR TO RUSH HOUR TRAFFIC AND REPLACE NEXT EVENING IF WORK REQUIRES MORE THAN ONE DAY TO COMPLETE ADDRESS ON APPLICATION- 3950 E GRANT RD
Contractors:
- HOFFMAN PROPIPE
- OLSEN PRECAST STRUCTURES
Completed Inspections
Permit Status: Final
Permit Number: T19RW05196
Permit Description: INSTALLING APPROXIMATELY 182 LF OF 10" CIPP LINING BETWEEN MANHOLE 4674-17-1 AND 4674-17 ADDDITIONALLY B & F WILL BE INSTALLING NEW CONCRETE COLLARS AND PERFORMING A INTERNAL BENCH REHAB ON BOTH MANHOLES. TRAFFIC CONTROL WILL BE RESTRICTED TO ONE LANE (CURB LANES) IN ALL DIRECTIONS WITH NO LEFT TURNS ALLOWED FOR THE ENTIRE INTERSECTION OF GRANT & ALVERNON WORK WILL BE CONDUCTED IN THE EVENING HOURS.
CONTRACTOR SHALL REMOVE TRAFFIC CONTROL IN THE MORNING PRIOR TO RUSH HOUR TRAFFIC AND REPLACE NEXT EVENING IF WORK REQUIRES MORE THAN ONE DAY TO COMPLETE
ADDRESS ON APPLICATION- 3950 E GRANT RD
Total Completed Inspections - 1
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/03/2020 | TDOT-EXCAV GENERAL INSPECTION | MVV | Approved | Completed. New Concrete collars at manholes. |