Permit Details

Status:
Final
Type:
Barricade and Excavation
Apply Date:
09/10/2019
Applicant:
TUCSON ELECTRIC POWER **B
Description:
TEP WILL BE INSTALLING 5 NEW POLES AND 3 DOWN GUYS/ANCHORS FROM N UNNAMED TO CALLE AGUA NUEVA (SEE PLAN SHEET FOR ALIGNMENT). THESE NEW POLES ARE BEING INSTALLED TO CORRECT CONFLICTS WITH ADOT PROJECT 010 PM 252 H8480 01 C CLOSEST ADDRESS IS 3030 W EL CAMINO DEL CERRO (NW OF WORK SITE ACROSS EL CAMIN DEL CERRO).
Contractors:
  • SIERRA NORTE BUILDERS LLC

Completed Inspections

Permit Status: Final
Permit Number: T19RW05045
Permit Description: TEP WILL BE INSTALLING 5 NEW POLES AND 3 DOWN GUYS/ANCHORS FROM N UNNAMED TO CALLE AGUA NUEVA (SEE PLAN SHEET FOR ALIGNMENT). THESE NEW POLES ARE BEING INSTALLED TO CORRECT CONFLICTS WITH ADOT PROJECT 010 PM 252 H8480 01 C CLOSEST ADDRESS IS 3030 W EL CAMINO DEL CERRO (NW OF WORK SITE ACROSS EL CAMIN DEL CERRO).
Total Completed Inspections - 1
Date Description Inspector Results Comments
02/28/2020 TDOT-EXCAV GENERAL INSPECTION A.Gomez Approved All TEP poles have been installed. No issues.

Documents

File Name Document Type  
T19RW05045.PDF ROW-RIGHT OF WAY VIEW
T19RW05045 R1.PDF ROW-RIGHT OF WAY VIEW
T19RW05045 R2.PDF ROW-RIGHT OF WAY VIEW