Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
Barricade and Excavation
Apply Date:
08/30/2019
Applicant:
B & F CONTRACTING INC
Description:
B & F CONTRACTING INC WILL BE INSTALLING APPROX 264' LF OF 8" CIPP LINING BETWEEN MANHOLES 8437-61 TO 7173-27-1 B & F WILL BE INSTALLING NEW CONCRETE COLLARS FOR BOTH MANHOLES AS WELL AS INTERNAL BENCH REHABILITATIONS. TRAFFIC CONTROL WILL CONSIST OF A FOOTBALL ON E. BELLEVUEW AND A LEFT LANE NORTHBOUND LAND AND CENTER LANE CLOSURE FOR N. ALVERNON WAY AT BELLEVUE ST NOW LEFT TURNS ONTO BELLEVUE WILL BE PERMITTED.
Contractors:
  • HOFFMAN PROPIPE
  • OLSEN PRECAST STRUCTURES

Completed Inspections

Permit Status: Final
Permit Number: T19RW04836
Permit Description: B & F CONTRACTING INC WILL BE INSTALLING APPROX 264' LF OF 8" CIPP LINING BETWEEN MANHOLES 8437-61 TO 7173-27-1 B & F WILL BE INSTALLING NEW CONCRETE COLLARS FOR BOTH MANHOLES AS WELL AS INTERNAL BENCH REHABILITATIONS. TRAFFIC CONTROL WILL CONSIST OF A FOOTBALL ON E. BELLEVUEW AND A LEFT LANE NORTHBOUND LAND AND CENTER LANE CLOSURE FOR N. ALVERNON WAY AT BELLEVUE ST NOW LEFT TURNS ONTO BELLEVUE WILL BE PERMITTED.
Total Completed Inspections - 1
Date Description Inspector Results Comments
03/03/2020 TDOT-EXCAV GENERAL INSPECTION MVV Approved Completed. New Concrete collars at manholes.

Documents

File Name Document Type  
T19RW04836.PDF ROW-RIGHT OF WAY VIEW