Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
Barricade Only
Address:
997 E 24TH ST
Address NEW:
997 E 24TH ST
Apply Date:
08/20/2019
Applicant:
K E & G CONSTRUCTION ***APA***
Description:
Installation of CIPP Lining between manholes 5656-02 to 5656-01. Provide MH rehabilitation and install a new collar for MH 5656-02. ADDRESS ON APPLICATION-990 E 24TH ST
Contractors:
  • INSITUFORM TECHNOLOGIES LLC

Completed Inspections

Permit Status: Final
Permit Number: T19RW04506
Permit Description: Installation of CIPP Lining between manholes 5656-02 to 5656-01. Provide MH rehabilitation and install a new collar for MH 5656-02. ADDRESS ON APPLICATION-990 E 24TH ST
Total Completed Inspections - 1
Date Description Inspector Results Comments
09/10/2019 TDOT-EXCAV GENERAL INSPECTION Bravin Approved sewer line has been relinned and all MH adjustments have been repaired with two rings of rebar and 3000 PSI concrete. No issues. Barricades were left up over night for concrete curing.

Documents

File Name Document Type  
T19RW04506.PDF ROW-RIGHT OF WAY VIEW