Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
Barricade and Excavation
Apply Date:
08/12/2019
Applicant:
K E & G CONSTRUCTION ***APA***
Description:
Installation of CIPP Lining between MH #5596-15 to 5596-17. Provide MH rehabilitation and install new collars for MH #5596-15, 5596-16, and 5596-17. ADDRESS ON APPLICATION: 100 S PARK AV
Contractors:
  • INSITUFORM TECHNOLOGIES LLC
  • PROFESSIONAL PIPE SERVICES

Completed Inspections

Permit Status: Final
Permit Number: T19RW04401
Permit Description: Installation of CIPP Lining between MH #5596-15 to 5596-17. Provide MH rehabilitation and install new collars for MH #5596-15, 5596-16, and 5596-17. ADDRESS ON APPLICATION: 100 S PARK AV
Total Completed Inspections - 1
Date Description Inspector Results Comments
09/10/2019 TDOT-EXCAV GENERAL INSPECTION Bravin Approved sewer line has been relinned and all MH adjustments have been repaired with two rings of rebar and 3000 PSI concrete. No issues. Barricades were left up over night for concrete curing.

Documents

File Name Document Type  
T19RW04401.PDF ROW-RIGHT OF WAY VIEW